Desa SBVBP(C), SBVBN(C) Installing GAS Piping to Stove Location, Installation Items Needed

Page 13

CAST IRON STOVE AND B-VENT BURNER SYSTEM INSTALLATION

Installing Gas Piping to Stove Location

13

CAST IRON STOVE AND B-VENT BURNER SYSTEM INSTALLATION

Continued

INSTALLING GAS PIPING TO STOVE LOCATION

WARNING: A qualified installer or service person must connect burner system to gas supply. Follow all local codes.

CAUTION: For propane/LP units, never connect burner system directly to the propane/LP supply. This burner system requires an external regulator (not supplied). Install the external regulator between the burner system and propane/LP supply.

Installation Items Needed

Before installing stove and burner system, make sure you have the items listed below.

• external regulator (supplied by installer)

• piping (check local codes)

• sealant (resistant to propane/LP gas)

• equipment shutoff valve *

• test gauge connection *

sediment trap

tee joint

pipe wrench

• approved flexible gas line with gas connector (if allowed by lo-

 

cal codes) (not provided)

Installation must include an equipment shutoff valve, union, and plugged 1/8" NPT tap. Locate NPT tap within reach for test gauge hook up. NPT tap must be upstream from burner system (see Figure 29).

Check your building codes for any special requirements for locating equipment shutoff valve to stoves.

Apply pipe joint sealant lightly to male NPT threads. This will prevent excess sealant from going into pipe. Excess sealant in pipe could result in clogged burner system valves.

WARNING: Use pipe joint sealant that is resistant to liquid petroleum (LP) gas.

External

Regulator

Propane/LP

Supply Tank

Vent Pointing

Down

Figure 28 - External Regulator with Vent Pointing Down (Propane/LP Only)

*A CSA design-certified equipment shutoff valve with 1/8" NPT tap is an acceptable alternative to test gauge connection. Purchase the CSA design-certified equipment shutoff valve from your dealer.

For propane/LP connections only, the installer must supply an external regulator. The external regulator will reduce incoming gas pressure. You must reduce incoming gas pressure to between 11 and 14 inches of water. If you do not reduce incoming gas pressure, heater regulator damage could occur. Install external regulator with the vent pointing down as shown in Figure 28. Pointing the vent down protects it from freezing rain or sleet.

Approved Flexible

Gas Line

3" Minimum

CSA Design-Certified Equipment Shutoff Valve with 1/8" NPT Tap*

Natural - From Gas Meter (5" W.C. to 10.5" W.C. Pressure )

LP - From External Regulator (11" W.C. to 14" W.C. Pressure)

CAUTION: Use only new, black iron or steel pipe. Internally-tinned copper tubing may be used in cer- tain areas. Check your local codes. Use pipe of 1/2" diameter or greater to allow proper gas volume to burner system. If pipe is too small, undue loss of volume will occur.

Cap Pipe Nipple Tee Joint

Sediment Trap/Drip Leg

*The CSA design-certified equipment shutoff valve may be sup- plied with the appliance or you can purchase it from your dealer.

Figure 29 - Gas Connection

For morevisit www..com

106828-01C

Image 13
Contents For Your Safety What to do if YOU Smell GAS For Your SafetySafety Information Table of ContentsTo operating burner system Product IdentificationPRE-INSTALLATION Preparation Product FeaturesLocal Codes Stove Body Assembly Cast Iron Stove and B-VENT Burner System AssemblyAttaching Stove Legs Installing Optional Blower Accessory Installing B-VENT Burner System Into Stove BodyON/OFF Installing Rear CoverInstallation Precautions Venting InstallationInstalling Vent System in a Chase Installation of Listed B-1 VentChecking Vent Capacity High Altitude InstallationChimneys Relining SystemsCast Iron Stove and B-VENT Burner System Installation Troubleshooting Venting ProblemsFlue GAS Spillage Causes of Spillage and Corrective ActionInstallation Items Needed Installing GAS Piping to Stove LocationPressure Testing Gas Supply Piping System Connecting STOVE/BURNER System to GAS SupplyChecking GAS Connections Installing Optional Wall Mounted Thermostat GWMT1 Installing Optional Wall Mount Switch GWMS2Pressure Testing Burner System Gas Connections Installing Battery in Receiver Installing Remote ReceiverREMOVING/REPLACING Glass Door Installing 9-Volt Battery in Hand-Held Remote Control UnitRemove glass door. See Removing/Replacing Glass Door, Installing LOGS, Lava ROCK, and Glowing EmbersManual Lighting Procedure For Your Safety Read Before LightingOperating Stove with B-VENT Burner System Lighting InstructionsOptional Remote Thermostat Series Operation Operating Stove with Vent Burner SystemON/OFF Series Models Ghrcb and Cghrcb Pilot Assembly Operating Optional Blower AccessoryInspecting Burners Operating Optional GWMT1 Wall Mounted ThermostatGlass Door Cleaning MaintenancePilot and Burners LogsObserved Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Gas leak. See Warning statement Technical Service Replacement PartsWiring Diagram Service HintsSbvbnc Sbvbpc SpecificationsModels Sbvbnc and Sbvbpc Illustrated Parts BreakdownKEY Part Number Description QTY Parts ListIndicates Color Suffix Designation Amity SCIVFC* Series PSCIVFC* SeriesIndicates Color Suffix Designation Amity SCIVFC* Series and PSCIVFC* SeriesReceiver and HAND-HELD Remote Control KIT Ghrcb and Cghrcb AccessoriesTHERMOSTATICALLY- Controlled Blower KIT CDA3620TB Owners Registration Form Postage Required 106828-01C Warranty Information

SBVBP(C), SBVBN(C) specifications

Desa SBVBP(C) and SBVBN(C) are two advanced models in the landscape of environmental and energy-efficient technologies. These innovative designs are at the forefront of sustainable construction, showcasing a plethora of features and characteristics that make them stand out.

One of the main features of Desa SBVBP(C) is its emphasis on bioclimatic architecture, which ensures that buildings harmonize with their surrounding environment. This model incorporates passive solar design principles, allowing natural light to penetrate efficiently while minimizing energy loss. High-performance thermal insulation is another significant characteristic, which helps maintain comfortable indoor temperatures regardless of external weather conditions.

Desa SBVBN(C) complements its counterpart with its remarkable integration of renewable energy technologies. Equipped with photovoltaic panels and wind turbine systems, this model harnesses natural energy sources to reduce reliance on non-renewable energy. The energy generated can be used for lighting, heating, and powering appliances, making the building self-sufficient and cost-effective over time.

Both models utilize smart technology for enhanced operational efficiency. Internet of Things (IoT) devices allow for real-time monitoring and control of energy consumption, promoting sustainable living practices among residents. Automated systems adjust lighting, heating, and cooling based on occupancy and time of day, further contributing to energy savings.

Water conservation is another crucial aspect of Desa SBVBP(C) and SBVBN(C). Both designs implement rainwater harvesting systems and greywater recycling technologies, ensuring that water usage is minimized and reused effectively. This not only lowers utility bills for occupants but also contributes to environmental sustainability by reducing the strain on local water resources.

The construction materials used in both models emphasize sustainability, utilizing recycled, locally sourced, and eco-friendly materials whenever possible. This commitment to green building practices ensures that the overall environmental footprint of the structures is minimal.

In summary, Desa SBVBP(C) and SBVBN(C) represent a paradigm shift towards eco-conscious living. Through the integration of advanced technologies, renewable energy sources, and smart systems, these models provide a blueprint for sustainable development that addresses the pressing challenges of climate change and environmental degradation. As cities around the world seek innovative solutions to improve urban living, models like these shine as beacons of hope and progress.