Desa SBVBP(C), SBVBN(C) installation manual Troubleshooting, Observed Problem Possible Cause

Page 23

TROUBLESHOOTING

Note: For additional help, visit DESA’s technical service web site at www.desatech.com.

Note: All troubleshooting items are listed in order of operation.

WARNING: Turn off burner sys- tem and let cool before servicing. Only a qualified service person should service and repair heater.

TROUBLESHOOTING

23

CAUTION: Never use a wire, needle, or similar object to clean pilot. This can damage pilot unit.

OBSERVED PROBLEM

POSSIBLE CAUSE

REMEDY

When ignitor button is pressed, there is no spark at pilot

1.Ignitor electrode not connected to igni- tor cable

2.Ignitor cable pinched or wet

3.Piezo ignitor nut is loose

4.Broken ignitor cable

5.Bad piezo ignitor

6.Ignitor electrode broken

7.Ignitor electrode positioned wrong

1.Reconnect ignitor cable

2.Free ignitor cable if pinched by any metal or tubing. Keep ignitor cable dry

3.Tighten nut holding piezo ignitor. Nut is located behind the mounting bracket.

4.Replace ignitor cable

5.Replace piezo ignitor

6.Replace pilot assembly

7.Replace pilot assembly

When ignitor button is pressed, there is spark at pilot but no ignition

1.Gas supply turned off or equipment shutoff valve closed

2.Control knob not in PILOT position

3.Control knob not pressed in while in PILOT position

4.Air in gas lines when installed

5.Depleted gas supply (propane/LP mod- els only)

6.Pilot is clogged

7.Gas regulator setting is not correct

1.Turn on gas supply or open equipment shutoff valve

2.Turn control knob to PILOT position

3.Press in control knob while in PILOT position

4.Continue holding down control knob. Repeat igniting operation until air is removed

5.Contact local propane/LP gas company

6.Clean pilot (see Cleaning and Mainte- nance, page 22) or replace pilot assembly

7.Replace gas control

Pilot lights but flame goes out when control

1.

Control knob not fully pressed in

1.

Press in control knob fully

knob is released

2.

Control knob not pressed in long enough

2.

After pilot lights, keep control knob

 

 

 

 

pressed in 30 seconds

 

3.

Equipment shutoff valve not fully open

3.

Fully open equipment shutoff valve

 

4.

Control valve damaged

4.

Replace control valve

For morevisit www..com

106828-01C

Image 23
Contents For Your Safety What to do if YOU Smell GAS For Your SafetySafety Information Table of ContentsTo operating burner system Product IdentificationLocal Codes Product FeaturesPRE-INSTALLATION Preparation Stove Body Assembly Cast Iron Stove and B-VENT Burner System AssemblyAttaching Stove Legs Installing Optional Blower Accessory Installing B-VENT Burner System Into Stove BodyON/OFF Installing Rear CoverInstallation Precautions Venting InstallationInstalling Vent System in a Chase Installation of Listed B-1 VentRelining Systems High Altitude InstallationChecking Vent Capacity ChimneysCauses of Spillage and Corrective Action Troubleshooting Venting ProblemsCast Iron Stove and B-VENT Burner System Installation Flue GAS SpillageInstallation Items Needed Installing GAS Piping to Stove LocationChecking GAS Connections Connecting STOVE/BURNER System to GAS SupplyPressure Testing Gas Supply Piping System Pressure Testing Burner System Gas Connections Installing Optional Wall Mount Switch GWMS2Installing Optional Wall Mounted Thermostat GWMT1 Installing Battery in Receiver Installing Remote ReceiverREMOVING/REPLACING Glass Door Installing 9-Volt Battery in Hand-Held Remote Control UnitRemove glass door. See Removing/Replacing Glass Door, Installing LOGS, Lava ROCK, and Glowing EmbersLighting Instructions For Your Safety Read Before LightingManual Lighting Procedure Operating Stove with B-VENT Burner SystemON/OFF Series Models Ghrcb and Cghrcb Operating Stove with Vent Burner SystemOptional Remote Thermostat Series Operation Operating Optional GWMT1 Wall Mounted Thermostat Operating Optional Blower AccessoryPilot Assembly Inspecting BurnersLogs Cleaning MaintenanceGlass Door Pilot and BurnersObserved Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Gas leak. See Warning statement Service Hints Replacement PartsTechnical Service Wiring DiagramSbvbnc Sbvbpc SpecificationsModels Sbvbnc and Sbvbpc Illustrated Parts BreakdownKEY Part Number Description QTY Parts ListIndicates Color Suffix Designation Amity SCIVFC* Series PSCIVFC* SeriesIndicates Color Suffix Designation Amity SCIVFC* Series and PSCIVFC* SeriesTHERMOSTATICALLY- Controlled Blower KIT CDA3620TB AccessoriesReceiver and HAND-HELD Remote Control KIT Ghrcb and Cghrcb Owners Registration Form Postage Required 106828-01C Warranty Information

SBVBP(C), SBVBN(C) specifications

Desa SBVBP(C) and SBVBN(C) are two advanced models in the landscape of environmental and energy-efficient technologies. These innovative designs are at the forefront of sustainable construction, showcasing a plethora of features and characteristics that make them stand out.

One of the main features of Desa SBVBP(C) is its emphasis on bioclimatic architecture, which ensures that buildings harmonize with their surrounding environment. This model incorporates passive solar design principles, allowing natural light to penetrate efficiently while minimizing energy loss. High-performance thermal insulation is another significant characteristic, which helps maintain comfortable indoor temperatures regardless of external weather conditions.

Desa SBVBN(C) complements its counterpart with its remarkable integration of renewable energy technologies. Equipped with photovoltaic panels and wind turbine systems, this model harnesses natural energy sources to reduce reliance on non-renewable energy. The energy generated can be used for lighting, heating, and powering appliances, making the building self-sufficient and cost-effective over time.

Both models utilize smart technology for enhanced operational efficiency. Internet of Things (IoT) devices allow for real-time monitoring and control of energy consumption, promoting sustainable living practices among residents. Automated systems adjust lighting, heating, and cooling based on occupancy and time of day, further contributing to energy savings.

Water conservation is another crucial aspect of Desa SBVBP(C) and SBVBN(C). Both designs implement rainwater harvesting systems and greywater recycling technologies, ensuring that water usage is minimized and reused effectively. This not only lowers utility bills for occupants but also contributes to environmental sustainability by reducing the strain on local water resources.

The construction materials used in both models emphasize sustainability, utilizing recycled, locally sourced, and eco-friendly materials whenever possible. This commitment to green building practices ensures that the overall environmental footprint of the structures is minimal.

In summary, Desa SBVBP(C) and SBVBN(C) represent a paradigm shift towards eco-conscious living. Through the integration of advanced technologies, renewable energy sources, and smart systems, these models provide a blueprint for sustainable development that addresses the pressing challenges of climate change and environmental degradation. As cities around the world seek innovative solutions to improve urban living, models like these shine as beacons of hope and progress.