Desa SBVBN(C), SBVBP(C) Connecting STOVE/BURNER System to GAS Supply, Checking GAS Connections

Page 14

14

CAST IRON STOVE AND B-VENT BURNER SYSTEM INSTALLATION

Installing Gas Piping to Stove Location (Cont.)

Connecting Stove/Burner System to Gas Supply

Checking Gas Connections

CAST IRON STOVE AND B-VENT BURNER SYSTEM INSTALLATION

Continued

We recommend that you install a sediment trap/drip leg in supply line as shown in Figure 29, page 13. Locate sediment trap/drip leg where it is within reach for cleaning. Install in piping system between fuel supply and burner system. Locate sediment trap/drip leg where trapped matter is not likely to freeze. A sediment trap traps moisture and contaminants. This keeps them from going into burner system gas controls. If sediment trap/drip leg is not installed or is installed wrong, burner system may not run properly.

CONNECTING STOVE/BURNER SYSTEM TO GAS SUPPLY

Installation Items Needed

5/16" hex socket wrench or nut-driver

sealant (resistant to propane/LP gas, not provided)

1.Open lower door panel.

2.Route flexible gas line (provided by installer) from equipment shutoff valve to burner system (see Figure 30). Route flexible gas supply line and attach to valve.

3.Check all gas connections for leaks. See Checking Gas Connections, column 2.

To Flare Fitting on

Control Valve

Equipment

Shutoff Valve

Flexible Gas Line from

To Gas Supply

Equipment Shutoff Valve

Provided by Installer

(Natural)

 

To External Regulator

 

(Propane/LP)

Figure 30 - Flexible Gas Line

 

CHECKING GAS CONNECTIONS

WARNING: Test all gas piping and connections, internal and external to unit, for leaks after installing or servicing. Correct all leaks at once.

WARNING: Never use an open flame to check for a leak. Apply noncorrosive leak test solution to all gas joints. Bubbles forming show a leak. Correct all leaks at once.

Pressure Testing Gas Supply Piping System

Test Pressures In Excess Of 1/2 PSIG (3.5 kPa)

1.Disconnect appliance with its appliance main gas valve (control valve) and equipment shutoff valve from gas supply piping systems. Pressures in excess of 1/2 psig (3.5 kPa) will damage burner system gas regulator.

2.Cap off open end of gas pipe where equipment shutoff valve was connected.

3.Pressurize supply piping system by either opening propane/LP supply tank valve for propane/LP gas burner system or opening main gas valve located on or near gas meter for natural gas burner system, or using compressed air.

4.Check all joints of gas supply piping system. Apply noncorro- sive leak test solution to all gas joints. Bubbles forming show a leak. Correct all leaks at once.

5.Reconnect burner system and equipment shutoff valve to gas supply. Check reconnected fittings for leaks.

Test Pressures Equal To or Less Than 1/2 PSIG (3.5 kPa)

1.Close equipment shutoff valve (see Figure 31).

2.Pressurize supply piping system by either opening propane/LP supply tank valve for propane/LP gas burner system or opening main gas valve located on or near gas meter for natural gas burner system, or using compressed air.

3.Check all joints from propane/LP supply tank or gas meter to equip- ment shutoff valve (see Figure 32 for propane/LP or Figure 33 for natural, page 15). Apply noncorrosive leak test solution to all gas joints. Bubbles forming show a leak. Correct all leaks at once.

Open

Equipment

Shutoff Valve

Closed

Figure 31 - Equipment Shutoff Valve

For..com

106828-01C

Image 14
Contents For Your Safety For Your Safety What to do if YOU Smell GASTable of Contents Safety InformationProduct Identification To operating burner systemLocal Codes Product FeaturesPRE-INSTALLATION Preparation Cast Iron Stove and B-VENT Burner System Assembly Stove Body AssemblyAttaching Stove Legs Installing B-VENT Burner System Into Stove Body Installing Optional Blower AccessoryInstalling Rear Cover ON/OFFVenting Installation Installation PrecautionsInstallation of Listed B-1 Vent Installing Vent System in a ChaseChimneys High Altitude InstallationChecking Vent Capacity Relining SystemsFlue GAS Spillage Troubleshooting Venting ProblemsCast Iron Stove and B-VENT Burner System Installation Causes of Spillage and Corrective ActionInstalling GAS Piping to Stove Location Installation Items NeededChecking GAS Connections Connecting STOVE/BURNER System to GAS SupplyPressure Testing Gas Supply Piping System Pressure Testing Burner System Gas Connections Installing Optional Wall Mount Switch GWMS2Installing Optional Wall Mounted Thermostat GWMT1 Installing Remote Receiver Installing Battery in ReceiverInstalling 9-Volt Battery in Hand-Held Remote Control Unit REMOVING/REPLACING Glass DoorInstalling LOGS, Lava ROCK, and Glowing Embers Remove glass door. See Removing/Replacing Glass Door,Operating Stove with B-VENT Burner System For Your Safety Read Before LightingManual Lighting Procedure Lighting InstructionsON/OFF Series Models Ghrcb and Cghrcb Operating Stove with Vent Burner SystemOptional Remote Thermostat Series Operation Inspecting Burners Operating Optional Blower AccessoryPilot Assembly Operating Optional GWMT1 Wall Mounted ThermostatPilot and Burners Cleaning MaintenanceGlass Door LogsTroubleshooting Observed Problem Possible CauseObserved Problem Possible Cause Remedy Gas leak. See Warning statement Wiring Diagram Replacement PartsTechnical Service Service HintsSpecifications Sbvbnc SbvbpcIllustrated Parts Breakdown Models Sbvbnc and SbvbpcParts List KEY Part Number Description QTYAmity SCIVFC* Series PSCIVFC* Series Indicates Color Suffix DesignationAmity SCIVFC* Series and PSCIVFC* Series Indicates Color Suffix DesignationTHERMOSTATICALLY- Controlled Blower KIT CDA3620TB AccessoriesReceiver and HAND-HELD Remote Control KIT Ghrcb and Cghrcb Owners Registration Form Postage Required 106828-01C Warranty Information

SBVBP(C), SBVBN(C) specifications

Desa SBVBP(C) and SBVBN(C) are two advanced models in the landscape of environmental and energy-efficient technologies. These innovative designs are at the forefront of sustainable construction, showcasing a plethora of features and characteristics that make them stand out.

One of the main features of Desa SBVBP(C) is its emphasis on bioclimatic architecture, which ensures that buildings harmonize with their surrounding environment. This model incorporates passive solar design principles, allowing natural light to penetrate efficiently while minimizing energy loss. High-performance thermal insulation is another significant characteristic, which helps maintain comfortable indoor temperatures regardless of external weather conditions.

Desa SBVBN(C) complements its counterpart with its remarkable integration of renewable energy technologies. Equipped with photovoltaic panels and wind turbine systems, this model harnesses natural energy sources to reduce reliance on non-renewable energy. The energy generated can be used for lighting, heating, and powering appliances, making the building self-sufficient and cost-effective over time.

Both models utilize smart technology for enhanced operational efficiency. Internet of Things (IoT) devices allow for real-time monitoring and control of energy consumption, promoting sustainable living practices among residents. Automated systems adjust lighting, heating, and cooling based on occupancy and time of day, further contributing to energy savings.

Water conservation is another crucial aspect of Desa SBVBP(C) and SBVBN(C). Both designs implement rainwater harvesting systems and greywater recycling technologies, ensuring that water usage is minimized and reused effectively. This not only lowers utility bills for occupants but also contributes to environmental sustainability by reducing the strain on local water resources.

The construction materials used in both models emphasize sustainability, utilizing recycled, locally sourced, and eco-friendly materials whenever possible. This commitment to green building practices ensures that the overall environmental footprint of the structures is minimal.

In summary, Desa SBVBP(C) and SBVBN(C) represent a paradigm shift towards eco-conscious living. Through the integration of advanced technologies, renewable energy sources, and smart systems, these models provide a blueprint for sustainable development that addresses the pressing challenges of climate change and environmental degradation. As cities around the world seek innovative solutions to improve urban living, models like these shine as beacons of hope and progress.