Desa SBVBN(D) installation manual Installing Optional Wall Mount Switch GWMS2, Will occur

Page 15

CAST IRON STOVE AND B-VENT BURNER SYSTEM INSTALLATION

Checking Gas Connections (Cont.)

Installing Optional Wall Mount Switch - GWMS2

Installing Optional Wall Mounted Thermostat - GWMT1

15

CAST IRON STOVE AND B-VENT BURNER SYSTEM INSTALLATION

Continued

Pressure Testing Burner System Gas

Connections

1.Open equipment shutoff valve (see Figure 30, page 14).

2.Open propane/LP supply tank valve for propane/LP burner system or main gas valve located on or near gas meter for natural gas burner system.

3.Make sure control knob of burner system is in the OFF position.

4.Check all joints from equipment shutoff valve to thermostat gas valve (see Figure 31 for propane/LP or Figure 32 for natural, page 15). Apply commercial leak test solution to all gas joints. Bubbles forming show a leak. Correct all leaks at once.

5.Light burner system (see Lighting Instructions, page 19). Check all other internal joints for leaks.

6.Turn off burner system (see To Turn Off Gas to Appliance, page 19).

Equipment

Propane/LP

Shutoff

Supply Tank

Valve

 

Gas Valve

 

Figure 30 - Checking Gas Joints for Propane/LP Gas Burner System (Amity™ Model Shown)

INSTALLING OPTIONAL WALL MOUNT SWITCH - GWMS2

1.Connect one terminal of 25 ft. wire for the wall switch to the TPTH terminal on the valve. Connect remaining wire terminal to the TH terminal on the valve. Make sure that the wire termi- nals are in the positions on the unit as pictured in Figure 33. If wires are not connected as shown, the switch will not work.

2.Route the 25 ft. wire through openings provided on the sides of the burner system to a convenient location to mount your switch.

3.Connect one bare wire end to each of the terminals of the GWMS2 wall switch.

4.Install the wall switch and cover in the wall.

To Control Switch or

Optional Accessory

Figure 33 - Control Valve Terminals

INSTALLING OPTIONAL WALL MOUNTED THERMOSTAT - GWMT1

WARNING: Installation must be done by a qualified installer familiar with low voltage wiring procedures.

WARNING: Do not connect this thermostat to any electrical source! Electrical shock and/or fire hazard

Gas Valve

Equipment Shutoff Valve

Gas Meter

will occur.

1.Open lower door panel. The valve is attached to the underside of the burner system assembly.

2.Disconnect from the valve the wires running from the ON/ OFF switch.

3.Connect one terminal of the wire for the wall thermostat to the THTP terminal on the valve. Connect remaining wire terminal to the TH terminal on the valve. Make sure that the wire termi- nals are in the positions on the unit as pictured in Figure 33. If wires are not connected as shown the thermostat will not work.

Figure 32 - Checking Gas Joints for Natural Gas Burner System (Amity™ Model Shown)

For morevisit www..com

112127-01A

Image 15
Contents For Your Safety What to do if YOU Smell GAS For Your SafetySafety Information Table of ContentsTo operating burner system Product IdentificationProduct Features PRE-INSTALLATION PreparationLocal Codes Stove Body Assembly Cast Iron Stove and B-VENT Burner System AssemblyVictor Hearth Models Removing Front Surround PanelRemoving Screen Optional Amity ModelsInstalling Optional Blower Accessory Installing B-VENT Burner System Into Stove BodySecurely in place before venting pipes are installed Installing Rear CoverInstallation Precautions Venting InstallationVertical Checking Vent CapacityHigh Altitude Installation ChimneysRelining Systems Causes of Spillage and Corrective Action Troubleshooting Venting ProblemsCast Iron Stove and B-VENT Burner System Installation Flue GAS SpillageInstallation Items Needed Installing GAS Piping to Stove LocationTest Pressures In Excess Of 1/2 Psig 3.5 kPa Connecting STOVE/BURNER System to GAS SupplyPressure Testing Gas Supply Piping System Checking GAS ConnectionsWill occur Installing Optional Wall Mount Switch GWMS2Installing Optional Wall Mounted Thermostat GWMT1 Pressure Testing Burner System Gas ConnectionsInstalling Battery in Receiver Installing Remote ReceiverREMOVING/REPLACING Glass Door Installing 9-Volt Battery in Hand-Held Remote Control UnitRemove glass door. See Removing/Replacing Glass Door, Installing LOGS, Lava ROCK, and Glowing EmbersLighting Instructions For Your Safety Read Before LightingManual Lighting Procedure Operating Stove with B-VENT Burner SystemOperating Stove with Vent Burner System Optional Remote Thermostat Series OperationON/OFF Series Models Ghrcb and Cghrcb Operating Optional GWMT1 Wall Mounted Thermostat Operating Optional Blower AccessoryPilot Assembly Inspecting BurnersLogs Cleaning MaintenanceGlass Door Pilot and BurnersObserved Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Above Gas leak. See Warning statementService Hints Replacement PartsTechnical Service Wiring DiagramSbvbnd Sbvbpd SpecificationsModels Sbvbnd and Sbvbpd Illustrated Parts BreakdownKEY Part Number Description QTY Parts ListVictor Hearth Stove Body Illustrated Parts BREAKDOWN1LAmity SCIVF* Series PSCIVF* Series Victor Hearth VH* Series Indicates Color Suffix Designation Amity Stove BodyKEY Part Description QTY Indicates Color Suffix DesignationStove Hearth Base GC10SPA AccessoriesReceiver and HAND-HELD Remote Control KIT Ghrcb and Cghrcb THERMOSTATICALLY- Controlled Blower KIT CDA3620TBOwners Registration Form Postage Required 112127-01A Warranty Information

SBVBN(D) specifications

Desa SBVBN(D) is an innovative development that stands out as a beacon of sustainable urban planning and advanced technological integration. Situated in a strategic location, it seeks to create a harmonious blend of modern living and environmental stewardship. The design ethos behind Desa SBVBN(D) revolves around minimizing the ecological footprint while maximizing community well-being.

One of the main features of Desa SBVBN(D) is its commitment to sustainable architecture. Buildings within the community are constructed using eco-friendly materials and designed to harness natural resources effectively. Solar panels are integrated into rooftops, contributing to energy self-sufficiency and significantly lowering energy costs for residents. In addition, rainwater harvesting systems and greywater recycling initiatives ensure responsible water usage, making the community resilient against water scarcity.

The layout of Desa SBVBN(D) emphasizes walkability and connectivity. Wide pedestrian pathways and cycling tracks encourage residents to engage in healthy, active lifestyles while reducing reliance on motor vehicles. Plentiful green spaces, including parks and community gardens, foster social interaction and provide recreational opportunities for families, promoting a sense of belonging among residents.

Technologically, Desa SBVBN(D) is at the forefront of smart city innovations. The implementation of IoT (Internet of Things) devices allows for real-time monitoring of energy usage, traffic patterns, and environmental conditions. Smart lighting systems that adjust based on natural light levels enhance safety while conserving energy. Furthermore, a dedicated app facilitates communication between residents and local authorities, streamlining services and community engagement.

Another distinctive characteristic of Desa SBVBN(D) is its focus on inclusivity and diversity. The community is designed to cater to various demographic groups, offering a range of housing options from affordable units to luxury apartments. Community centers serve as hubs for cultural exchange, educational workshops, and vocational training, empowering residents and fostering a collaborative spirit.

In conclusion, Desa SBVBN(D) represents a forward-thinking approach to urban living, marrying sustainability with technology. With its emphasis on community, resilience, and innovation, it stands as a model for future developments aimed at enhancing the quality of life while protecting the planet for future generations.