Zanussi ZHC 951 manual Installing the Cooker Hood, Unpacking, Installation Components, Documents

Page 11

INSTALLING THE COOKER HOOD

Unpacking

The hood is supplied with the following components for installation as illustrated. Item Qty Description

11 Hood body, complete with: Controls, lighting, blower and filters

21 Telescopic chimney comprising:

2.11 Upper section

2.21 Lower section

7.11 Telescopic frame complete with

 

 

extractor, consisting of:

7.1a

1

Upper frame

7.1b

1

Lower frame

8a

1

Right-hand air outlet grille

8b

1

Left-hand air outlet grille

9a

1

Ø120-125mm Ducting collar

9b

1

Ø150-120mm Ducting spigot

14

1

Recirculation extension ducting

14.12 Recirculation extension ducting

15

1

Recirculation spigot

24

1

Junction box

25

2

Jubilee Clips

Item

Qty

Installation Components

12c

6

Ø2.9 x9.5mm Chimney fixing

 

 

screws

12e

2

Ø2.9 x6.5mm Junction box

 

 

fixing screws

12f

4

M6x10mm Hood body fixing

 

 

screws

12g

4

M6x80mm Lower frame fixing

 

 

screws

12h

4

Ø5.2x70mm Upper frame fixing

 

 

screws

21

1

Ceiling drilling template

Item

Qty

Documents

 

1

Instruction Manual

21

 

 

22

23

11

 

 

 

7.1a

 

12h

 

 

12g

 

15

7.1

14.1 14

7.1b

9

12c

25

2.1

2

2.2

8b

8a

12e 24

12c

12c

1

12f

10

Image 11
Contents Cooker Hood Electrical Connection For the User Important Safety Information Your ApplianceInstalling the Cooker Hood Maintenance and Service Important Safety InformationInstallation Child SafetyCooker Hood Controls Your Appliance Operating InstructionsExtraction To OperateRecirculation Charcoal Filter Maintenance and CleaningExternal Cleaning Metal Grease FiltersPage Cooker hood will not start Symptom SolutionCooker hood has switched off during Something not WorkingThis Guarantee does not cover Guarantee ConditionsElectrical Requirements Installation InstructionsTechnical information Documents Installing the Cooker HoodInstallation Components UnpackingClearance Heights Installation RequirementsLower Frame Drilling the Ceiling/Support ShelfFixing the Frame Upper FrameDucting Connection 150 Ø120Fitting the Hood Body Recirculation ConnectionChimney Stack Fitting the ChimneyWorking Test Electrolux plc 436001739 01