Garland operation manual Dimensions and SPECIFICATIONS, Model C836-1-35F

Page 4

DIMENSIONS AND SPECIFICATIONS, MODEL C836-1-35F

4-1/2"

(114mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CLEARANCES

 

SHIPPING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INSTALLATION

ENTRY

 

 

 

 

 

 

WEIGHT

 

 

 

 

 

 

Sides

Rear

Crated

Uncrated

 

 

 

 

 

 

 

37-7/8"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(962mm)

34"

 

6"

6"

29-1/4"

18-1/4"

220lb.

 

 

 

(864mm)

(152mm)

(152mm)

(743mm)

(464mm)

(100kg)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8-1/2"

(216mm)

4-1/2" (114mm)

6-1/2"

(165mm)

36-1/4"

(921mm)

30-1/4"

(768mm)

6"

(152mm)

18"

(457mm)

34-3/8"

(873mm)

27-3/8"

(695mm)

32-11/16" (830mm)

TOTAL INPUT

OPERATING

ORIFICE

MANIFOLD

PRESSURE

 

 

 

 

PIPE SIZE

 

 

 

 

 

 

Natural

Propane

NAT

PRO

NAT

PRO

 

 

 

 

 

 

 

 

110,000 BTU/Hr

85,000 BTU/Hr

4.0" WC

9.0" WC

#51

1.05MM

1-1/4” N.P.T

(32.23kW/Hr)

(24.91kW/Hr)

(10mbar)

(22mbar)

 

 

 

Gas input ratings shown here are for installations up to 2,000 feet (610mm) above sea level.

Input must be derated for high altitude installations.

FRYING CAPACITY (per hour)

FRENCH FRIES

FISH

BREADED CHICKEN

Raw to Done

Blanched to Done

3oz. (84g), Battered

Raw to Done

 

 

 

 

60lb. (27kg)

80lb. (36kg)

60lb. (27kg)

28lb. (13kg)

Page 4

Part # 4518632 (02/19/08)

Image 4
Contents Cuisine Series Heavy Duty GAS Fryer Model C836-1-35F 4518632 02/19/08Important Information Table of Contents Dimensions and SPECIFICATIONS, Model C836-1-35F Installation Pre-Installation InstructionsRating Plate ClearancesInstallation FrypotCasters LegsInstallation Using the Fryer for the First Time Be installed Within the backOperation Radiation ShieldOperation Product Temperature Time Suggestions for Quality Fried FoodCleaning and Maintenance Cleaning Stainless SteelRoutine Care Draining and Filtering Of Fryer CompoundMaintenance Cleaning and MaintenancePreventive Maintenance Adjustments Trouble Shooting and AdjustmentsPossible Causes Remedy Trouble Shooting and Adjustments Thermostat Calibration4518632 02/19/08 Page Page Suite Réglages ET Dépannage Thermostat Du ÉtalonnageThermomètre ThermostatSolution Possibles Causes Réglages ET DépannageRéglages Endommagés connexion de FilsSuite Nettoyage ET Entretien EntretienCorrecte Préventif EntretienNettoyage ET Entretien Inoxydable Acier NettoyageRoutine De Entretien Friture De Produit Du Filtration Et VidangeSuite Utilisation Qualité DeFrits Aliments Des Pour Suggestion Temps Température Produit’utilisation Conseils Sécurité De ProblèmesComplet Arrêt 02/19/08 4518632 nº Pièce Min 360Utilisation Attente’allumage Instructions Friteuse La De Utilisation PremièreSuite Installation Protecteur ÉcranMontage De Instructions Précédemment démontéAir en Alimentation et Ventilation Batterie en MontageFriture de Bassin Tuyaux Des Diamètre Et Gaz Du ConnexionsDégagements PiedsInstallation Avant Instructions Signalétique Plaque35F-1-C836 Modèle SPÉCIFICATIONS, ET Dimensions Installation Matières DES TableNettoyage ET Entretien UtilisationImportantes Informations Inc Industries, Commercial Garland Angleterre Canada