Installation
IMPORTANT
This appliance must be installed by qualified personnel.
The manufacturer will not accept liability, should the above instructions or any of the other safety instructions incorporated in this book be ignored.
Gas Connection
On the end of the shaft (A) , which includes the GJ 1/2" threaded elbow, an adjustable joint is fixed so that the washer (B) is fitted between the components as shown in figure 4.
A drop of paint at both edges of the "L" joint (C) will evidence that the good seal of the connection has been tested in the factory.
Before connecting the gas supply pipe to the joint (C), the installer will ensure that the paint drop is unbroken and the "L" connector has not been moved by the vibrations during handling and transportation.
When the final connection has been made, it is essential that a thorough leak test is carried out on the hob and installation.
Ensure that the main connection pipe does not exert any strain on the hob.
FO 1010
A) | End of shaft with nut | Fig. 4 |
B) | Washer |
|
C) | Adjustable joint |
|
Cut Out Size
The dimensions of the
8
Rectangular cut-out size for hob
580 | SR | 510 | |
| |||
|
| ||
| SR | A |
|
|
| R |
|
| 550 |
| 470 |
|
|
| |
55 | min |
|
|
|
|
| |
| . |
|
|
FO 2340 |
|
|
|
Dimensions are given in millimeters | Fig. 5 |