Zanussi ZGG 659 Building over a cupboard or drawer, Building over a kitchen unit with door

Page 9

Building in

Building over a cupboard or drawer

If the hob is to be installed above a cupboard or drawer it will be necessary to fit a heat resistant board below the base of the hob on the underside of the work surface.

Building over a kitchen unit with door

Proper arrangements must be taken in designing the furniture unit, in order to avoid any contact with the bottom of the hob which can be heated when it is operated. The recommended solution is shown in diagram 1.

The panel fitted under the hob ("a") should be easily removable to allow easy access if technical assistance is needed. The space behind the kitchen unit ("b") can be used for connections.

Building over a kitchen unit with oven

If the hob is built into a kitchen unit with an oven underneath, the recess must have the dimensions shown in diagrams 2 and 3, and should also incor- porate suitable oven crosspiece supports to ansure an efficient cooling air circulation.

Diagrams 4 and 5 give two building-in examples.

The electric connection of the hob and the oven should be carried out separately, for electrical safety reasons to permit easy extraction of the oven from the front part of the kitchen unit.

 

 

1

 

 

30

 

a

min

60

20

 

 

b

 

FO 1013

a)Removable panel

b)Room for connections

2

FO 0947

4

3

550 min.

560 min.

FO 0198

5

FO 0939

FO 0938

9

Image 9
Contents GAS HOB Important Safety Information Contents Description of the Appliance InstallationOperation Using the hob correctlyHob burners control knobs Lighting the burnersHob Top Maintenance and CleaningPan Supports BurnersInstructions for the Installer Engineers technical dataSomething Not Working? Gas Connection InstallationCut Out Size Rectangular cut-out size for hobBuilding over a cupboard or drawer BuildingBuilding over a kitchen unit with door Building over a kitchen unit with ovenFitting the hob to Worktop These safety measures not be observedElectrical connection Permanent ConnectionCommissioning Procedure