5. Technical Data
Gas Burners Rating
Rapid Burner | 2,1 kW (GPL) - 2,3 kW (GZ 50/GZ | 35) |
Semirapid Burner | 1,5 kW (GPL) - 1,6 kW (GZ 50/GZ | 35) |
Auxiliary Burner | 0,7 kW | |
|
| |
Category | ||
|
| |
Setting | Natural Gas GZ 50 20 mbar |
Gas connection | G 1/2" |
Electric Supply | 230 V 50 Hz |
HOBRECESS |
|
DIMENSIONS |
|
|
|
Length | 560 mm. |
Width | 480 mm. |
6.Instruction for the Installer
λThe following instructions about installation and maintenance must be carried out by qualified personnel in compliance with the regulation in force.
λThe side walls of the unit in which the hob is going to be installed, must not exceed the height of the working top.
λAvoid installing the appliance in the proximity of inflammable materials (e.g. curtains, tea towels etc.).
λThe appliance must be electrically disconnected before all interventions. If any electric supply to the appliance is required to carry out the work, ensureallthenecessaryprecautionsarefollowed.
A)Ramp with ending nut
B)Seal
C)Adjustable connection
GAS CONNECTION
Choose fixed connections or use a flexible pipe in stainless steel.
If using flexible metallic pipes, be careful they do not come in contact with mobile parts or they are not squeezed. Use the same attention when the hob is combinated with an oven.
IMPORTANT - To ensure a correct operation, a saving of energy and the
The adjustable connection is fixed to the comprehensive ramp by means of a threaded nut GJ 1/2". Interpose the sealing between the components as shown in fig. 4.
Screw the parts without forcing, adjust the connection in the required direction and tighten everything.
IMPORTANT - When the final connection has been made, it is essential that a thorough leak test is carried out on the hob and installation. Use some soapy water, never a flame.
FO 2365
Fig. 4
7