NEC 616 manual 210, Unit

Page 12

..

I 2(

 

 

 

 

 

 

 

 

SECTION

200

HARDWARE

INSTALLATION

 

 

 

 

 

 

 

 

 

210

Installation

of

the

Key

Service

Unit

 

 

210.2

Floor

Mounting

the

 

KSU

 

 

 

 

 

 

210.1

Wall

Mounting the

KSU

 

 

 

 

 

 

1.

The

same

bracket

that

is provided

for

wall

mounting

1.

The ES-6-l

 

KSU

is

supplied

with a wall mounting

 

can also be used to anchor a floor mounted KSU. Set

 

 

the bracket on a level surface with the 6 screw holes

 

bracket. The bracket should be mounted on a back-

 

 

 

down and the securing screw facing up and the floor

 

board secured in a manner capable of holding the

 

 

 

mounting slot to the right.

 

 

 

 

 

 

 

weight of the KSU. With the mounting tabs of the

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

bracket

facing

upward,

install

appropriate

screws

into

2.

Loosen

the securing

screw

located

in

the

rear

right

 

the 6 holes

of

the

bracket.

Loosen the

securing screw

 

position

of

the

bracket.

 

 

 

 

 

 

 

 

located in the upper right position of the bracket.

 

3.

Engage the

mounting

tabs on the

bracket into the slots

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2.

Align the mounting

slots

of the KSU with the mount-

 

on

the

bottom

of

the

 

KSU

and

push

forward to

seat

 

ing tabs of the bracket,

and push down to seat the

 

the

KSU securely.

 

 

 

 

 

 

 

 

 

KSU securely.

 

 

 

 

 

 

 

 

 

 

4. Locate and tighten the securing screw through the hold

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3.

Remove

the

front

cover

of

the

KSU,

and

locate

and

 

provided

on the

bottom

 

panel

of the

KSU.

 

 

tighten the securing .screw through the hole provided

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

above the J 1 connector.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SECURING SCREW \

\

0

0

-0

FLOOR MOUNTING SLOT

Fig. 210-l Front View of hbunting Bracket

Page

Image 12
Contents NEC 150 Installation Site Requirements # TElectrical and Ground Requirements CO/PBX ~--.~ CO/PBX List of Equipment Otrtoge Component System Configuration Svw-sLSystem Block Diagram Connecting and Testing the Power Supply -z Installing210 UnitConnecting and Testing the Power Supply Set PSU Power Switch to Off PositionSWM-SKTU CLK-S KTU Volume Controls MDF Installation 240.1 CO/PBX Connection See Note Connector Running List Simplified Schematic ET-6-7 Telephone Connection IrkaIling Station Equipment2View of Modular Terminal for Connection of ET-$-l Telephone 200-il ~-.C~~-~~ 2m-13 On - OFF PiT=q p7i-l OEoo YL-BR 2SE BR-YL 2SEG YL-SL EA Job Specifications 340 Programming Sheets 300-12Programming Explanation of ProgrammingResident System Program Contents Programing Operations Buttons 1 8 are used to Enter Data320.6 Read Comments Cwpbx Assiignments Station Assignment Assignments Programming !%eets Memory Block Hklte 77~1 lines cnn be omitted from fhe scm Speed Dial Toil Override Assignment See 340-23 Toll Paging Zone Real! Button Assignment Memory Block Address Example Psge Memoryblock Address Example 16 I L1 Internal Paging Zone Assignment STA Addresses Example Page Memory Block 5g%D5 CO/FBX 4 =C ADD CO/PSX PBX Code None Page Digit None Disallow Example Toll Override Table Chart 26 Electra-616 Toll Denial Algorithm 300 Operation Procedure SECTllON 400 Station Key Telephone OperationPage CO/PSX Key Display Shows For Alarm Page Page Page Page LA Hands-free Telephone Assignment CHAG~INSIANDAPDPIUQUMIING Page Page Page 28Hands-FreeTelephone Assignment T3 El Page CUT Menljrfad CXJ’F m on Page Page Page Page 400 KkJTooPERAlT Page Page CO/PBX Line