NEC 616 manual Connecting and Testing the Power Supply, Set PSU Power Switch to Off Position

Page 13

220 Connecting and Testing the Power Supply

Note 1: Verify that the AC outlet is supplying 11% AC and provides good conduit ground. If there is a problem with the AC voltage, have it corrected.

If there is no conduit ground, provide alternate ground as explained in Section 120, “Grounding Requirements”, of this manual.

Note 2: Before proceeding, ensure that the PS-6-I Power

Cord is unplugged. The PS-6-I Power Switch should be off, and its power indicator lamps should

1.Remove the 9-pin connectorended cable of the power supply from the connector of the KSU.

2.Plug the AC cord of the power supply into an AC outlet. Set PSU Power switch to on position. The PSU Power Indicator Lamp should light. Use a voltmeter, to the figure below:

Fig. 220-I Front View of g-pin Connector of PS-6-l

3.Set PSU Power Switch to Off Position

Note:

Verify

that step 3 has been

completed before

pro-

I

ceeding.

Verify that PS-6-I

Power Indicator

Lamp

is off:

 

 

 

 

 

 

 

4.Connect the 9-pin connectorended cable of the Power Supply Unit to the 9-pin connector of the KSU. Ensure that the looking tabs are engaged.

5.Turn the PSU Power Switch on. DC voltage (under load) can now be read on the TBl terminal block located on the left side of KSU.

 

 

+41v

7

 

 

+24V

 

t

1

 

 

I03

 

+12v

 

 

 

 

I@/

+5v

 

Ie3

 

+41G

 

 

 

 

I@I

+24G

 

 

 

I

I

 

 

H, I

+5G

 

cl3

 

 

 

+12G

 

e3

 

+12G

 

 

+5G

 

Fig. 220-2 View of TBI Terminal Block

When measuring DC voltages, note that each voltage has its own reference ground.

6.The Power Supply Switch must be set in the Offposi- tion before proceeding with installation.

Note: Veriyy that Step 6 has been completed before pro- 1 @) ceeding. Verify that PS-6-i Power indicator Lamp- I

is oft

Page 200-2

Image 13
Contents NEC 150 # T Installation Site RequirementsElectrical and Ground Requirements CO/PBX ~--.~ CO/PBX List of Equipment Otrtoge Component Svw-s System Configuration LSystem Block Diagram Installing Connecting and Testing the Power Supply -zUnit 210Set PSU Power Switch to Off Position Connecting and Testing the Power SupplySWM-SKTU CLK-S KTU Volume Controls MDF Installation 240.1 CO/PBX Connection See Note Connector Running List IrkaIling Station Equipment Simplified Schematic ET-6-7 Telephone Connection2View of Modular Terminal for Connection of ET-$-l Telephone 200-il ~-.C~~-~~ 2m-13 On - OFF PiT=q p7i-l OEoo YL-BR 2SE BR-YL 2SEG YL-SL EA 340 Programming Sheets 300-12 Job SpecificationsExplanation of Programming ProgrammingResident System Program Contents Buttons 1 8 are used to Enter Data Programing Operations320.6 Read Comments Cwpbx Assiignments Station Assignment Assignments Programming !%eets Memory Block Hklte 77~1 lines cnn be omitted from fhe scm Speed Dial Toil Override Assignment See 340-23 Toll Paging Zone Real! Button Assignment Memory Block Address Example Psge Memoryblock Address Example 16 I L1 Internal Paging Zone Assignment STA Addresses Example Page Memory Block 5g%D5 CO/FBX 4 =C ADD CO/PSX PBX Code None Page Digit None Disallow Example Toll Override Table Chart 26 Electra-616 Toll Denial Algorithm 300 SECTllON 400 Station Key Telephone Operation Operation ProcedurePage CO/PSX Key Display Shows For Alarm Page Page Page Page LA Hands-free Telephone Assignment CHAG~INSIANDAPDPIUQUMIING Page Page Page 28Hands-FreeTelephone Assignment T3 El Page CUT Menljrfad CXJ’F m on Page Page Page Page 400 KkJTooPERAlT Page Page CO/PBX Line