Cowon Systems JKP85 Installation Instructions Pre- Installation Checklistcont

Page 4

Installation Instructions

Pre- Installation Checklistcont.

Place the oven on a table or platform even with the cutout opening. (Platform must support 275 lbs.)

Remove the bottom trim from the top of the oven. It will be installed at the end of installation. The trim is wrapped separately and taped to the top of the unit.

Bottom Trim

Side Trim

4

Image 4
Contents Installation InstructionsParts Included Materials NeededFor Your Safety Installation InstructionsElectrical Requirements Installation Instructions Pre- Installation Checklist ScrewdriverInstallation Instructions Pre- Installation Checklistcont Cutout for Built-In Oven W/Microwave Overall Width. 5/8Installation Instructions Electrical ConnectionsInstallation Instructions Electrial Connections B4 Three-Conductor Branch Circuit ConnectionPlacing the Oven in the Opening C1 Sliding the Oven Into the OpeningReplacingDoor the Oven Operation Checklist PRE-TEST Check ListPage 229C4053P460