AB Soft 6424 manual Assemble Truss, The nut goes on outside of the truss

Page 9
11 Assemble Truss

11 Assemble Truss

 

TF (6)

TE (6)

a. Attach Brace (AC) to two Roof Truss Channels (AB) (one on each

 

side of Brace. Secure Brace with Screws (TF) and Nuts (TE).

 

Follow picture above to connect Brace to a Truss Channel at each end of the Brace.

The nut goes on outside of the truss.

b.Use Truss Connector (TA) to attach Roof Truss Channels at top. Secure with Screws (TF) and Nuts (TE). Before completely tightening, lay assembly on its side to be sure Channels and Brace are parallel. Completely tighten all hardware.

WARNING

Do not overtighten the Cap Nut. If the end of the Bolt breaks through the plastic cap, call our Customer Service Department.

Be sure that Truss Connector is aligned with the Truss Channels.

9

Image 9
Contents OUTDOOR STORAGE BUILDING MODEL 30” OUTDOOR STORAGE EXTENSION KITO U T D O O R S T O R A G E BEFORE BEGINNING ASSEMBLY A MINIMUM OF TWO ADULTS ARE REQUIRED FOR ASSEMBLYSAFETY INSTRUCTIONS Call Cust mer Service atIf you are Installing a New Shed HARDWARE IS ACTUAL SIZEIf you are Extending an Existing Shed Save all hardware for re-assembly a. Remove last three skylightsa. Remove the back 3 roof caps a. Remove the Roof Truss a. Remove the last two Side Wall Panels 8 Assemble Window a. Add Wall Panels The nut goes on outside of the truss 11 Assemble TrussDo not overtighten the Cap Nut TD TB TBa.Add Roof Panels 114 and Roof Supports AD a. Add TrussRoof Panel Ridge Roof Panel Wall b. Add a center Roof Capa. Add next Truss a. Add Skylights 0130 30” Shelf Kit w/ hardware 3 pack 0110 Corner Shelf 2 pack0150 90” Shelf Kit w/ hardware 0113 16” Pegboard Strips w/ hardware