Westinghouse W-019 1/15/04 owner manual Mise EN Garde, Advertencia

Page 11

FIGURE 2.

GROUP A:

CONNECT TO BLACK

CONNECT TO WHITE

HOUSE WIRE

GROUP B: HOUSE WIRE

BLACK

 

WHITE

WHITE OR GREY WITH TRACER

WHITE OR GREY WITHOUT TRACER

BROWN, GOLD OR BLACK

BROWN, GOLD OR BLACK WITH TRACER

WITHOUT TRACER

 

NOTE: When parallel wire (SPT I & SPT II) is used; the neutral wire is square shaped and ridged, and the hot wire will be round in shape and smooth. (See below.)

FIGURE 2.

À BRANCHER AU FIL NOIR

À BRANCHER AU FIL BLANC

GROUPE A: DE LA RÉSIDENCE

GROUPE B: DE LA RÉSIDENCE

NOIR

BLANC

BLANC OU GRIS AVEC TRACEUR

BLANC OU GRIS SANS TRACEUR

BRUN, DORÉ OU NOIR SANS TRACEUR

BRUN, DORÉ OU NOIR AVEC TRACEUR

NOTA: Dans le cas des fils parallèles (SPT I et SPT II), le fil neutre est carrè et Côtelè et le fil chargè est rond et lisse. (Voir ci-dessus)

FIGURA 2.

GRUPO A:

CONÉCTELO AL CABLE

CONÉCTELO AL CABLE

NEGRO DE LA CASA

GRUPO B: BLANCO DE LA CASA

NEGRO

 

BLANCO

BLANCO O GRIS CON MARCAS

BLANCO O GRIS SIN MARCAS

MARRÓN, DORADO O NEGRO SIN MARCAS

MARRÓN, DORADO O NEGRO CON MARCAS

NOTA: Cuando se usa cable en paralelo (SPT 1 y SPT 2), el cable neutro es cuadrado y acanalado, y el cable vivo es redondo y liso. (Ver abajo.)

WARNING

Turn off electricity to the mounting site before beginning installation.

Mounting instructions must be followed exactly as shown for the fixture to be safely supported.

MISE EN GARDE

Coupez le courant au site de montage avant de commencer l’installation.

Assurez-vous de suivre les instructions de montage exactement comme illustré afin que l’appareil d’éclairage soit installé de façon sécuritaire.

ADVERTENCIA:

Desconecte el suministro eléctrico al sitio de mon- taje antes de comenzar la instalación.

Se deben seguir las instrucciones de montaje exactamente como se indican para que el aparato tenga un soporte seguro.

11

Image 11
Contents Outdoor Lighting Fixture Installation Instructions Electrical Shock can Result in Serious Injury Warranty InformationNot Supplied Fixture Assembly Instructions Mounting and Wiring InstructionsGarantie Limitée DE Cinq ANS Les instructions d’installation demeurent cependant valables Instructions D’ASSEMBLAGE DE Lappareil Déclairage Instructions DE Montage ET DE RaccordementAdvertencia UNA Descarga Eléctrica Podría Causar Lesiones Garantía Limitada DE Cinco AñosFigura Instrucciones DE Montaje DEL Artefacto Instrucciones DE Montaje Y CableadoAdvertencia Mise EN GardeNettoyage ET Entretien Cleaning and CareCommande DE Pièces Ordering Parts

W-019 1/15/04 specifications

The Westinghouse W-019, introduced on January 15, 2004, is a remarkable piece of technology that signifies advancements in energy production and management. As a part of Westinghouse’s well-established reputation in the nuclear power industry, the W-019 model showcases innovative features and characteristics that meet the demands of modern energy requirements.

One of the standout features of the Westinghouse W-019 is its enhanced safety systems. The reactor design incorporates a series of passive safety measures that require minimal human intervention and ensure the stability of operations, even under adverse conditions. This addresses the growing concerns surrounding nuclear safety and aims to provide a greater assurance for operators and the public alike.

Furthermore, the W-019 is built on the company’s proprietary AP1000 technology, which optimizes efficiency and sustainability. The design boasts a streamlined construction process, reducing both time and cost during the plant build phase. The modular design allows for factory-fabricated components, enhancing quality control and speeding up assembly on-site, which is crucial in meeting modern energy demands.

In terms of operational efficiency, the Westinghouse W-019 promises superior performance. It is capable of achieving a net electrical output that ensures a substantial contribution to a balanced energy portfolio. Coupled with advanced digital instrumentation and control systems, the model provides operators with more precise management of the reactor and support for real-time decision-making.

In addition to its efficiency, the Westinghouse W-019 is designed to integrate seamlessly with renewable energy sources, supporting a transition towards more sustainable energy practices. The potential for hybrid systems enables the co-utilization of nuclear and renewable sources, optimizing energy output while minimizing environmental impact.

The W-019 also offers unique characteristics in containment design, featuring robust structures that withstand natural disasters and other external threats. This aspect of the design underscores a commitment to safeguarding against a broad spectrum of risks, promoting a more resilient energy infrastructure.

In summary, the Westinghouse W-019 represents a crucial evolution in nuclear technology. With its focus on safety, operational efficiency, and resilience, it embodies the principles of modern energy production while addressing global sustainability goals. By harnessing advanced technology and innovative design, the W-019 is poised to contribute significantly to the future of energy generation.