Sterling Plumbing SP1500D Series manual Measure and Cut the Bottom Track, Base

Page 6

Measure

 

Measure

here.

Measure distance

here.

 

"D" above curves in

 

 

the corners.

 

Angled

 

Curved

Base

 

Base

D

Warning: Measure carefully. If your walls are curved or angled, measure above the curve or angle. Failure to do so can result in an improperly cut bottom track and can void the warranty.

Important: Do not cut on the pivot side.

9/16" (1.4 cm)

For Right Pivots

Pivot End

Pivot End

D

Front Side of

Bottom Track

For Left Pivots

9/16" (1.4 cm)

2. Measure and Cut the Bottom Track

IMPORTANT! Risk of product damage. If your shower has a curve in the corners where they meet the sidewalls, be sure to measure from wall to wall above the curves. Failure to measure above the curve or angle could result in the bottom track being cut too short.

Determine the pivot end of the bottom track. If you are not sure which end is the pivot end, position the bottom track on the ledge with the front side of the track toward the outside of the shower.

Measure from wall to wall at the flattest part of the shower ledge (Distance D).

Subtract 9/16(1.4 cm) from dimension D.″ The resulting dimension is the bottom track cut length.

IMPORTANT! Measure from the pivot side of the bottom track. Mark and cut the strike side.

Mark the strike side at the determined distance (see the previous section to determine the strike side).

NOTE: For best results use a miter box and 32-teeth per inch hacksaw to make the cut.

Cut the bottom track at the mark. Do not cut the pivot end.

File the rough edges smooth where the bottom track was cut, taking care to avoid damaging finished surfaces.

1034026-2-D

6

Sterling

Image 6
Contents Installation Guide Tools and Materials Before You BeginParts Identification Very Important Instructions Determine the Door Configuration Measure and Cut the Bottom Track BaseLocate the Bottom Track Install the ″U″ ChannelInstall the U-Channel Locate the Bottom TrackMark the Wall Jamb Locations Prepare the Wall Jamb LocationsCaulk and Install the Bottom Track Seal the Bottom TrackInstall the Wall Jambs Install the Wall JambsCaulk the Bottom Track and Wall Jambs Install the Blocks Cut the Top Track Install the Pivot BlockMeasure and Cut the Top Track Install the Top Track Install the Top TrackInstall the Strike Expander Jamb Install the Strike Expander JambInstall the Fixed Panel Install the Fixed GlassInstall the Bottom Pivot Install the Bottom PivotInstall the Top Pivot on the Door Panel Install the Top PivotInstall the Door Panel Install the Door PanelInstall the Bumper Plug Caulk the Shower Door From outside the showerOutils et matériels Avant de commencerIdentification des pièces Instructions très importantes Déterminer la configuration de la porte Mesurer et couper le rail inférieur Pour pivots droitsInstaller le profilé en U Installer le profilé en ″U″Déterminer l’emplacement du rail inférieur Déterminer lemplacement du rail inférieurMarquer les emplacements du montant du mur Préparer les emplacements du montant du murAppliquer du mastic et installer le rail inférieur Mastiquer le rail inférieur Installer le rail inférieurInstaller les montants du mur Installer les montants du murMastiquer le rail inférieur Mesurer et couper le rail supérieur Installer les blocsInstaller le bloc du pivot Découper le rail supérieurInstaller le rail supérieur Installer le rail supérieurInstaller le montant de butée extensible Installer le panneau fixeInstaller le montant de fermeture Installer le verre fixe Installer le pivot inférieur Installer le pivot inférieurInstaller le pivot supérieur sur le panneau de la porte Installer le pivot supérieurInstaller le panneau de porte Installer le panneau de porteInstaller la butée Appliquer du mastic sur la porte de douche De l’extérieur de la doucheHerramientas y materiales Antes de comenzarIdentificación de las piezas ¡IMPORTANTE Instrucciones muy importantesDetermine la configuración de la puerta Mida y corte el carril inferior Base en ÁnguloInstale el canal en U Instale el canal en ″U″Coloque el carril inferior Coloque el carril inferiorMarque el lugar de instalación de las jambas murales Prepare los lugares de instalación de las jambas muralesSelle e instale el carril inferior Selle el carril inferior Instale el carril inferiorInstale las jambas murales Instale las jambas muralesSelle el carril inferior y las jambas murales Selle el carril inferiorMida y corte el carril superior Instale los bloquesCorte el carril superior Instale el carril superior Instale el carril superiorInstale la jamba de expansión de contacto Instale el panel fijoInstale el pivote inferior Instale el pivote superior en el panel de la puertaInstale el pivote inferior Instale el pivote superior Instale el panel de la puerta Instale el panel de la puertaInstale el tope Selle la puerta de ducha Desde el exterior de la ducha1034026-2-D 1034026-2-D By Kohler Co