Servis-Rhino 4211SS manual Before Operating this Machine

Page 33

INTRODUCTION

Attention Owner/Operator

BEFORE OPERATING THIS MACHINE:

1.Carefully read the Operator’s Manual, completely understand the Safety Messages and instructions, and know how to operate correctly both the tractor and implement.

2.Fill out the Warranty Card in full. Be sure to answer all questions, including the Serial Number of the implement. Mail within 30 days of delivery date of this implement.

NOTE: Warranties are honored only if completed “Owner Registration and Warranty” forms are received by Alamo Group within thirty days of delivery of the implement.

3.Record the Loader Model and Serial Numbers on the Warranty page. Keep this as part of the permanent maintenance file for the implement.

4211-4211SS 01/11

Introduction Section 2-5

© 2011 Alamo Group Inc.

INTRODUCTION

Image 33
Contents 4211 4211SS To the Owner/Operator/Dealer Table of Contents Maintenance Section Safety Section General Safety Instructions and Practices Safety4211-4211SS 01/11 Safety Section Operator Safety Instructions and Practices Equipment Operation Safety Instructions and Practices SG-36 Safety Safety 4211-4211SS 01/11 Safety Section SL-33 Safety Safety Transporting Safety Instructions and Practices Maintenance and Service Safety Instructions and Practices 4211-4211SS 01/11 Safety Section See Your Rhino Dealer Concluding Safety Instructions and Practices Storage and Parking Safety Instructions and PracticesDecal Location QTY Level Description Decal Description Loader Positions 4211-4211SS 01/11 Safety Section Loader Safety Safety Federal Laws and Regulations Introduction Section Introduction Introduction Introduction Before Operating this Machine Page Assembly and Connecting the Loader Section Assembly Instructions AssemblyAssembly Proper Rear Ballasting and Wheel Spacing Dismounting Loader Dismounting Loader and Mounting Loader to TractorMounting Loader Attaching Pin on BucketMounting Attachment to Loader Mounting and Dismounting AttachmentAssembling Quick Attach Device Installing Quick Attach Device When Connecting an Attachment to the Loader Quick Hitch Assembly Page Operation Section Rhino 4211 & 4211SS Loader OperationStandard Equipment and Specifications Operator Requirements Operation Personal Protective Equipment PPE Tractor Requirements Rops and Seat BeltTractor Lighting and SMV Emblem Tractor Ballast Getting On and Off the TractorDismounting the Tractor Boarding the TractorStarting the Tractor Pre-Operation Inspection and Service Loader Pre-Operation Inspection and Service Tractor Pre-Operation Inspection/ServiceMount Assembly OPS-L-0007B Do not Operate an Unsafe Tractor or Front END Loader Front END Loader PRE-OPERATION Inspection Driving the Tractor and Loader Driving the Tractor and Loader Operating the Tractor and LoaderSG-36 Operation Operation SL-33 Operation Filling the Bucket Operating the LoaderOperation Lifting the Load Carrying the Load Lowering the Bucket Dumping the BucketOperating with Float Control Loading from a Bank Operation Peeling and Scraping Loading LOW Trucks or Spreaders from a Pile Backfilling Operation Handling Large Heavy Objects Operating Bale Spear Loader Storage Transporting the Tractor and ImplementShutting Down the Implement Operation Transporting on Public Roadways Operation Hauling the Tractor and Implement Troubleshooting Guide Page Maintenance Section Maintenance 4211-4211SS 01/11 Maintenance Section Lubrication Schedule Daily Maintenance Lift and Bucket Cylinder Disassembly Cylinder ServiceStorage Lift and Bucket Cylinder ReassemblyStore loader with attachment securely attached Proper Torque for Fasteners Maintenance Maintenance Rhino To the OWNER/OPERATOR/DEALER 4211/4211SS