Servis-Rhino 4211SS manual Getting On and Off the Tractor, Tractor Ballast

Page 54
(SG-12)

OPERATION

OPERATION

3.3 Tractor Ballast

Before operating tractor and loader, add sufficient counterweight so a minimum of 25% of the total weight is on the rear axle. Total weight includes weight of: tractor, loader, rated load in bucket, and counterweight. Rated load is lift capacity at full height at 500mm forward of bucket pivot point (See Standard Equipment and Specifications). When determining required counterweight bucket should be at maximum forward position (bucket pivot point at the same height as boom pivot point on mast).

To ensure tractor stability when operating add wheel ballast or rear weights to rear tractor tires. For better stability, use tractor with wide front axle rather than tricycle front wheels. Move wheels to the tractor manufacturer’s widest recommended settings to increase stability. If 3-Point hitch counterweights are used, they should be carried as low as possible at all times to maximize stability. Effective counterbalance weight at rear axle of mounted rear equipment is determined by multiplying actual weight of equipment by 1.50.

EXAMPLE: Equipment weighing 800 pounds, attached to tractor, multiplied by 1.50, equals 1200 pounds of effective counterbalance weight at rear axle.

A tractor that does not meet this criteria is DANGEROUS and should not be operated as upset of the unit can occur resulting in possible serious injury and property damage. OPS-L- 0001_A

4. Getting On and Off the Tractor

Do not mount or dismount the Tractor while the tractor is moving. Mount the Tractor only when the Tractor and all moving parts are completelystopped.

Before getting onto the tractor, the operator must read and completely understand the implement and tractor operator manuals. If any part of either manual is not completely understood, consult an authorized dealer for a complete explanation. OPS-L- 0022

4211-4211SS 01/11

Operation Section 4-8

© 2011 Alamo Group Inc.

Image 54
Contents 4211 4211SS To the Owner/Operator/Dealer Table of Contents Maintenance Section Safety Section Safety General Safety Instructions and Practices4211-4211SS 01/11 Safety Section Operator Safety Instructions and Practices Equipment Operation Safety Instructions and Practices SG-36 Safety Safety 4211-4211SS 01/11 Safety Section SL-33 Safety Safety Transporting Safety Instructions and Practices Maintenance and Service Safety Instructions and Practices 4211-4211SS 01/11 Safety Section See Your Rhino Dealer Storage and Parking Safety Instructions and Practices Concluding Safety Instructions and PracticesDecal Location QTY Level Description Decal Description Loader Positions 4211-4211SS 01/11 Safety Section Loader Safety Safety Federal Laws and Regulations Introduction Section Introduction Introduction Introduction Before Operating this Machine Page Assembly and Connecting the Loader Section Assembly Assembly InstructionsAssembly Proper Rear Ballasting and Wheel Spacing Dismounting Loader and Mounting Loader to Tractor Dismounting LoaderAttaching Pin on Bucket Mounting LoaderMounting and Dismounting Attachment Mounting Attachment to LoaderAssembling Quick Attach Device Installing Quick Attach Device When Connecting an Attachment to the Loader Quick Hitch Assembly Page Operation Section Operation Rhino 4211 & 4211SS LoaderStandard Equipment and Specifications Operator Requirements Operation Personal Protective Equipment PPE Tractor Requirements Rops and Seat BeltTractor Lighting and SMV Emblem Getting On and Off the Tractor Tractor BallastBoarding the Tractor Dismounting the TractorStarting the Tractor Pre-Operation Inspection and Service Tractor Pre-Operation Inspection/Service Loader Pre-Operation Inspection and ServiceMount Assembly OPS-L-0007B Do not Operate an Unsafe Tractor or Front END Loader Front END Loader PRE-OPERATION Inspection Driving the Tractor and Loader Operating the Tractor and Loader Driving the Tractor and LoaderSG-36 Operation Operation SL-33 Operation Operating the Loader Filling the BucketOperation Lifting the Load Carrying the Load Dumping the Bucket Lowering the BucketOperating with Float Control Loading from a Bank Operation Peeling and Scraping Loading LOW Trucks or Spreaders from a Pile Backfilling Operation Handling Large Heavy Objects Operating Bale Spear Loader Storage Transporting the Tractor and ImplementShutting Down the Implement Operation Transporting on Public Roadways Operation Hauling the Tractor and Implement Troubleshooting Guide Page Maintenance Section Maintenance 4211-4211SS 01/11 Maintenance Section Lubrication Schedule Daily Maintenance Cylinder Service Lift and Bucket Cylinder DisassemblyLift and Bucket Cylinder Reassembly StorageStore loader with attachment securely attached Proper Torque for Fasteners Maintenance Maintenance Rhino To the OWNER/OPERATOR/DEALER 4211/4211SS