Servis-Rhino 4211SS manual Peeling and Scraping

Page 78

OPERATION

OPERATION

PEELING AND SCRAPING

Use a slight bucket angle, travel forward and hold lift control forward to start the cut. Make a short 5 to 8 foot angle cut and break out cleanly.

With bucket level, start a cut at notch approximately 2 inches deep. Hold depth by feathering bucket control to adjust cutting lip up or down. When front tires enter the notch, adjust lift cylinder to maintain proper depth.

Make additional passes until desired depth is reached. During each pass, use only bucket control while working depth. This will allow you to concentrate on controlling bucket angle to maintain a precise cut.

4211-4211SS 01/11

Operation Section 4-32

© 2011 Alamo Group Inc.

Image 78
Contents 4211 4211SS To the Owner/Operator/Dealer Table of Contents Maintenance Section Safety Section Safety General Safety Instructions and Practices4211-4211SS 01/11 Safety Section Operator Safety Instructions and Practices Equipment Operation Safety Instructions and Practices SG-36 Safety Safety 4211-4211SS 01/11 Safety Section SL-33 Safety Safety Transporting Safety Instructions and Practices Maintenance and Service Safety Instructions and Practices 4211-4211SS 01/11 Safety Section See Your Rhino Dealer Storage and Parking Safety Instructions and Practices Concluding Safety Instructions and PracticesDecal Location QTY Level Description Decal Description Loader Positions 4211-4211SS 01/11 Safety Section Loader Safety Safety Federal Laws and Regulations Introduction Section Introduction Introduction Introduction Before Operating this Machine Page Assembly and Connecting the Loader Section Assembly Assembly InstructionsAssembly Proper Rear Ballasting and Wheel Spacing Dismounting Loader and Mounting Loader to Tractor Dismounting LoaderAttaching Pin on Bucket Mounting LoaderMounting and Dismounting Attachment Mounting Attachment to LoaderAssembling Quick Attach Device Installing Quick Attach Device When Connecting an Attachment to the Loader Quick Hitch Assembly Page Operation Section Operation Rhino 4211 & 4211SS LoaderStandard Equipment and Specifications Operator Requirements Operation Personal Protective Equipment PPE Tractor Requirements Rops and Seat BeltTractor Lighting and SMV Emblem Getting On and Off the Tractor Tractor BallastBoarding the Tractor Dismounting the TractorStarting the Tractor Pre-Operation Inspection and Service Tractor Pre-Operation Inspection/Service Loader Pre-Operation Inspection and ServiceMount Assembly OPS-L-0007B Do not Operate an Unsafe Tractor or Front END Loader Front END Loader PRE-OPERATION Inspection Driving the Tractor and Loader Operating the Tractor and Loader Driving the Tractor and LoaderSG-36 Operation Operation SL-33 Operation Operating the Loader Filling the BucketOperation Lifting the Load Carrying the Load Dumping the Bucket Lowering the BucketOperating with Float Control Loading from a Bank Operation Peeling and Scraping Loading LOW Trucks or Spreaders from a Pile Backfilling Operation Handling Large Heavy Objects Operating Bale Spear Loader Storage Transporting the Tractor and ImplementShutting Down the Implement Operation Transporting on Public Roadways Operation Hauling the Tractor and Implement Troubleshooting Guide Page Maintenance Section Maintenance 4211-4211SS 01/11 Maintenance Section Lubrication Schedule Daily Maintenance Cylinder Service Lift and Bucket Cylinder DisassemblyLift and Bucket Cylinder Reassembly StorageStore loader with attachment securely attached Proper Torque for Fasteners Maintenance Maintenance Rhino To the OWNER/OPERATOR/DEALER 4211/4211SS