North Star M165939J owner manual Using Gasoline, To start engine using gasoline

Page 31

Operation (cont’d)

Using Gasoline

WARNING:

Never open oil port while engine is running. Hot oil can spray over face and body.

To start engine using gasoline:

1)Disconnect all loads to the generator.

2)Flip the fuel selector switch to the GASOLINE position.

3)Turn the gasoline line valve to the ON position.

4)For cold engine, move choke lever to full choke position. To restart a warm engine, move choke lever to half choke or to RUN position.

5)Start the engine:

a)Turn the engine key switch to the START position and hold it there until the engine starts.

NOTE: If the engine fails to start after 5 seconds, release key and wait 10 seconds before attempting to start again. Cranking the electric starter for more than 5 seconds continuously can overheat and damage the starter motor.

b)Release the key when the engine starts.

6)When engine starts, move choke lever to RUN position.

7)Under long, continuous-run operating conditions, be prepared to:

a)Check and refuel the engine on a regular basis. A tank of gas should last about 4 hours under 100% load, and about 8 hours under 50% load. See engine owner’s manual for more detail.

WARNING:

A running engine is hot enough to ignite fuel. Never add fuel or remove gas cap if engine is running or still hot. Let cool at least 2 minutes.

b)Check engine oil level each time you refuel.

c)Change oil after the first 20 operating hours, and at least every 100 operating hours thereafter, as directed in the engine owner’s manual.

WARNING:

Never open oil port while engine is running. Hot oil can spray over face and body.

31

Image 31
Contents M165939J Hazard Signal Word Definitions Table of Contents About Your Generator About Your GeneratorRead this Manual About Your Generator cont’dSpecifications Item #165939J SpecificationsPart numbers Description Safety Label Locations Item #165939JDescription Machine Component Identification Item #165939JReference Guide Reference 13 120V, 20A, Duplex Example conversion to watts Power Load Planning & ManagementTotal 6275W Power Load Planning & Management cont’dPlanning the Power Load Installation / Initial Set-UpUnpacking & Delivery Inspection Gas Hook-up Installation for Natural Gas or LPG if needed Installation / Initial Set-Up Set-up either as a Building BACK-UP or Portable Power Source Generator Current/Power Maximum Extension Cord Length Select a Suitable Site Structure allow at least a 7’ clearance Grounding the generator Battery Installation Operation General safety rules for operationOperation cont’d Operation cont’d Manual Preparing for OperationOperation cont’d Natural Gas Start LPG/NG supply If usingOperation cont’d Starting the Engine Using LP/NG To start engine using LP or Natural GasTo start engine using gasoline Checking Generator Output Connecting Loads Stop the engine using the following steps Switching Fuels during operationStopping Storage & Exercise When you are finished using the generator, you mustOperation cont’d Maintenance & Repair Maintenance & RepairMaintenance & Repair cont’d Troubleshooting TroubleshootingSummary of Importation Information for Operation Battery SafetySummary of Importation Information for Operation cont’d Installation / Initial Set-up SafetyPersonal protective equipment Know how to operate\Gasoline Safety Propane & Natural Gas SafetySafety During Use Safety After use Generator Exploded View Rev J Fig # Description Qty Wiring Diagram Rev J Diag # Description Qty Diag # Description Qty Fuel Delivery System Rev JRef # Description Qty Generator Head Exploded View Rev J