North Star M165939J owner manual Connecting Loads

Page 33

Operation (cont’d)

5. Connecting Loads

You will want to be careful when connecting loads so as not to overload the generator, especially if you are powering devices with motors that require a higher starting power load.

Instructions are provided below for connecting loads when you are using the generator:

oAs a portable power source

oConnected to a building as a back-up power source

WARNING:

Do not overload generator. Make sure that combined starting and running loads do not exceed rated capacity of generator. Overloading the generator can cause damage to the generator and attached electrical devices, and may result in fire.

Using as a

Portable Power

Source

Using as a Back-up Power Source for a Building

Connect electrical loads one at a time according to the following instructions:

1.Allow engine to reach operating speed by allowing it to warm up for approximately 5 minutes before connecting electrical devices.

2.After engine is warmed up, begin by connecting the items that require the highest wattage first. The recommended sequence is as follows:

a.Connect items with motors such as refrigerators, freezers, air conditioners, or small hand tools, one at a time. Let each motor stabilize before connecting the next device.

b.Connect any lights you are planning on powering.

c.Connect voltage sensitive equipment such as electronics via surge protectors. Plug devices such as TV’s, computers, and microwaves into a UL listed voltage surge protector, then plug the surge protector into the generator.

Each transfer switch installation will be unique.

Proper instructions for how to safely bring the generator online with the building’s electrical system should be provided by the installing electrician, who should also provide personal instruction to the owner/operator.

Failure to follow the proper procedure as provided by the electrician could expose persons to the hazards noted above.

33

Image 33
Contents M165939J Hazard Signal Word Definitions Table of Contents About Your Generator About Your GeneratorRead this Manual About Your Generator cont’dSpecifications Item #165939J SpecificationsPart numbers Description Safety Label Locations Item #165939JDescription Machine Component Identification Item #165939JReference Guide Reference 13 120V, 20A, Duplex Example conversion to watts Power Load Planning & ManagementTotal 6275W Power Load Planning & Management cont’dInstallation / Initial Set-Up Planning the Power LoadUnpacking & Delivery Inspection Gas Hook-up Installation for Natural Gas or LPG if needed Installation / Initial Set-Up Set-up either as a Building BACK-UP or Portable Power Source Generator Current/Power Maximum Extension Cord Length Select a Suitable Site Structure allow at least a 7’ clearance Grounding the generator Battery Installation Operation General safety rules for operationOperation cont’d Operation cont’d Manual Preparing for OperationOperation cont’d Natural Gas Start LPG/NG supply If usingOperation cont’d Starting the Engine Using LP/NG To start engine using LP or Natural GasTo start engine using gasoline Checking Generator Output Connecting Loads Switching Fuels during operation Stop the engine using the following stepsStopping Storage & Exercise When you are finished using the generator, you mustOperation cont’d Maintenance & Repair Maintenance & RepairMaintenance & Repair cont’d Troubleshooting TroubleshootingSummary of Importation Information for Operation Battery SafetySummary of Importation Information for Operation cont’d Installation / Initial Set-up Safety\Gasoline Safety Know how to operatePropane & Natural Gas Safety Personal protective equipmentSafety During Use Safety After use Generator Exploded View Rev J Fig # Description Qty Wiring Diagram Rev J Diag # Description Qty Diag # Description Qty Fuel Delivery System Rev JRef # Description Qty Generator Head Exploded View Rev J