Marantz LN-11S1A manual ESU Erofe B P F O E MAN Stra CI SAB Arepo N IO T

Page 12

ESU EROFE B P F O E MAN STRA CI SAB AREPO N IO T

SETUP

3. Install the combined Plates #1 and #2 (or Plate 1 with the EXT10) securely to the Building Structure following all of the Local Building/Construction Codes. Use suitable hardware in adequate quantity and size depending on the installation requirements.

Wire

Access

4. Attach the Horizontal Tilting Plate #3 to the previously combined plates (already installed on ceiling) using the 1/4-20 inch screws provided. Refer to Figures ?? and ??. Install two 1/4-20inch screws with rubber spacers and metal washers part way into the welded metal studs (indicated #1). The newly combined Plate 3 provides 10 degrees of horizontal tilt. After positioning the plate, loosely tighten the screws.

5. Tighten all the recently install hardware and proceed to install the LN-11S1A.

VDEARCELLNOART NOC ET O MER

PUTEGS IN T OOHSEL BUORT AREPO N IO T AREPO N IO T

SRE HT O

Figure 11

EXT10

Plate #3

Plate #1

Figure 12

Caution:

The Projector together with the mounting brackets weighs 59 pounds (26.7kg).

Figure 13

Note:

When the EXT10 Extension Pole will be used, attach the “Inner Pole” end to combined Plate #2 and #3 (instead of Plate #2) using four (4) 5/16-18 inch nuts and washers provided. Refer to Figure 13.

Titing Capability

Titing Capability

Figure 14

Figure 15

8

Image 12
Contents LN-11S1A Important Safety Instructions English CE Marking Contents IntroductionChecking the Unit and Supplied Accessories Before USENames of Parts Turning the Power on Turning the Power OFFBasic Operation Basic Operation Setup Setup Procedure EXT10 AssemblyPreparing the LN-11S1A Assembling the MOUNT20ESU Erofe B P F O E MAN Stra CI SAB Arepo N IO T Mounting the LN-11S1A On the Ceiling Connecting the LN-11S1A Mounting the LN-11S1AOn the Floor Adjusting the LN-11S1A Lens Troubleshooting OthersSpecifications & Dimensions Main UnitIs a registered trademark