Base Assembly

Important–Read the following carefully Before Proceeding

The first step in assembly is to assemble a proper base. The greenhouse must be properly supported to help prevent property damage and injury in the event of strong winds or inclement weather. Wind and ground conditions may vary from site to site, and may affect the practicality and effectiveness of anchoring methods substantially.

Be certain to check with local authorities to obtain all required building permits and to familiarize yourself with any building codes that may apply.

Decide on a location for the greenhouse. The location should be a level, well-lit area that is sheltered from the wind. The door of the greenhouse should not open towards the prevailing wind, if possible.

1.Excavate an area for the base of the greenhouse. The area must be 8’ 2” wide by

10’ 2” long by 21/2” – 23/4” deep. The floor of the hole must be level and square. The diagonal dimensions, from corner to corner, should each be 13’.

2.Assemble the Base outside the hole as shown below. Note that the angled edges of the Base Plates (40, 41a, 41b) need to face the corners of the base. Use Base Bolts (45), Base Nuts (46), and Connectors (42, 43) to secure the pieces together.

 

42

41a

 

 

 

 

 

40

 

 

 

42

43

41b

41a

43

 

42

 

 

 

 

 

42

 

 

 

 

40

41b

Base Assembly

3.With assistance, lower the Base into the hole. The diagonal dimensions, from out- side corner to outside corner, must be equal for the base to be square.

4.Fill the hole around the outside of the base with soil.

5.This base will need to be filled with about 17-18 cubic feet of gravel or another ap-

propriate fill material (not provided). The gravel should reach up to about 1/2” – 3/4” below the lip of the base.

SKU 93920

For technical questions, please call 1-800-444-3353.

Page

Image 5
Contents ’ x 10’ Greenhouse Contents Save This Manual SpecificationsSKU For technical questions, please call Important-Read the following carefully Before Proceeding Frame Assembly Eft Figure B Assembling the Roof FrameFigure C Assembling the Studs and BracesFront Floor Plate View from above Figure C, inset, and diagram to the right. Repeat for Figure D Assembling the Roof Studs and BracesAssembling the Window Using two Short Bolts 59 and two Nuts 61, attach the Door Installing the Transparent Panels # = Panel Clip 67 Location 49 # 48 # Please Read the Following Carefully Part Description ’ty Parts ListParts List