Global Machinery Company PB26D Assembly, Mixing the fuel, Before 10 hours After 10 hours

Page 7

Assembly

IMPORTANT. Blower tube installation affects both blower balance and performance. The tube and nozzle are correctly installed when the label ‘THIS SIDE UP’ is visible to the operator during normal operation.

WARNING. Danger from rotating impeller! Stop the engine before installing or removing the blower tubes. Never perform any maintenance or assembly procedures on this machine while the engine is running.

1.Place the blower upright on the ground or on a sturdy work surface.

2.Push the nozzle tube (5) over the straight tube (4) lining up the locking pins.

3.Rotate the nozzle tube clockwise locking it into place.

4.Remove the tube locking screw (13).

5.Push the assembled blower tube over the discharge port and locking pin.

6.Rotate the tube clockwise to lock it into position.

7.Retighten the locking screw.

Mixing the fuel

ENGINE FUEL: MIX AT 25:1 (Before 10 hours operation) & 30:1 (After 10 hours operation) ONLY

25:1

30:1

(Before 10 hours)

(After 10 hours)

IMPORTANT. Use good quality air cooled 2-stroke engine oil.

This product is powered by a 2-stroke engine and requires pre-mixing fuel with 2-stroke oil.

1.Use fresh unleaded petrol. You must use 100% synthetic oil specifically made for heavily stressed two- stroke engines.

2.Mix the petrol and oil in an approved container. Never mix fuel directly in the blower fuel tank.

WARNING. Never use any type of pre-mixed fuel/oil direct from fuel stations. This may include special blends intended for use in mopeds, motorcycles, etc.

3.Mix the fuel thoroughly and also each time before fuelling.

4.Always pre-mix in small quantities. Never mix quantities larger than what will be used in a 30 day period.

Note. Do not store petrol in plastic containers. Keep fuel out of the reach of Children.

Filling the fuel tank

WARNING. Always shut off the engine before fuelling. Never add fuel to a machine with a running or hot engine. Move at least 9 m (30 ft.) away from the re-fuelling site before starting engine. Do not smoke when re-fuelling or operating the blower vac.

WARNING. Do not use another mixture ratio other than 25:1 (Before 10 hours operation) & 30:1 (After 10 hours operation) and never use pure fuel. Do not use fuel that is

7

Image 7
Contents Petrol Blower Contents Environmental protection Description of symbolsSpecifications IntroductionSubstitute faulty silencers Safety rules for petrol blowersTurn off the engine if you must leave the blower unattended Additional safety rules for petrol blowersContents of carton UnpackingKnow your product Filling the fuel tank AssemblyMixing the fuel Before 10 hours After 10 hoursStarting the blower OperationChoke control Use of the petrol blower MaintenanceStopping the blower BlowingProblems Storage and maintenance after useIf the engine wont stop GMC customer assist

PB26D specifications

The Global Machinery Company PB26D is an advanced piece of equipment that has gained significant attention in the construction and heavy machinery industry. This machine offers a combination of ruggedness, efficiency, and reliability, making it an ideal choice for various applications, from construction sites to landscaping projects.

One of the standout features of the PB26D is its powerful engine, which provides exceptional horsepower while maintaining excellent fuel efficiency. This makes the machine capable of tackling heavy loads and demanding tasks without sacrificing performance. The advanced engine technology ensures lower emissions, adhering to stringent environmental regulations while still delivering the power required for challenging jobs.

The PB26D is designed with an ergonomic operator cabin that enhances comfort and accessibility. With adjustable seating, intuitive controls, and excellent visibility, operators can work for extended periods without fatigue. The cabin is also equipped with modern climate control systems, ensuring a comfortable working environment regardless of outdoor conditions.

In terms of technology, the PB26D incorporates advanced hydraulic systems that improve lifting capabilities and overall performance. Its hydraulic design allows for precise movements, enabling operators to execute complex maneuvers with ease. This precision is particularly beneficial in urban environments where space is often limited.

Durability is a hallmark of the PB26D, with reinforced materials and components built to withstand the rigors of daily use. The machine features a robust chassis and proven components that resist wear and tear, resulting in lower maintenance costs and longer service life. This makes it an investment that pays off over time, as operators can rely on its consistent performance without frequent downtime.

Safety is also a top priority for the PB26D, with several built-in features designed to protect both the operator and the machine. These include advanced braking systems, stability controls, and operator presence sensors. The strategic placement of these features ensures that the machinery operates efficiently while minimizing risks on the job site.

In summary, the Global Machinery Company PB26D stands out as a reliable and efficient machine suited for a wide range of applications. Its powerful engine, ergonomic design, advanced hydraulic systems, and safety features make it a valuable asset for contractors and operators alike. Whether for construction, landscaping, or other heavy-duty tasks, the PB26D is equipped to deliver performance and durability in demanding environments.