Cadet CEH-005M warranty Installation Instructions, Horizontal Delivery, General Safety Information

Page 2

READ ALL INSTRUC- TIONS AND SAFETY INFORMATION.

Installation Instructions

PLACEMENT: Install the CEH unit heater vertically or horizontally. Brackets are also available for ceiling mount or wall mount applications.

THERMOSTAT: A line voltage OR low voltage thermostat is required for operation. A Cadet wall thermostat is recommended for ultimate control and comfort.

WARNING! When working with electricity,

turn the electrical power off at the electrical panel board and lock or tag the circuit breaker door. Failure to do so could result in serious electrical shock, burns, or possible death.

WARNING! Risk of Fire. Heaters must be kept clean of lint, dirt and debris.

Failure to follow warnings may cause heater to eject sparks, ignite materials, or cause electrical shock.

Horizontal Delivery

Heaters should be located so that the air streams of the individual units "wipe" the exposed walls of the building without blowing directly against the wall. Recommended spacing between the units is 12 feet. Locate heaters so their air streams are not subjected to interference from columns, partitions, machinery, etc.

(See Figure 1)

Figure 1.

 

 

CEILING

 

 

 

 

 

 

 

 

 

 

 

 

1/2"

 

BACK

 

 

 

 

 

 

 

 

 

 

MOUNTING

 

 

MIN

.

6"

 

 

 

 

BOLT

SIDE

WALL

 

 

 

 

 

 

 

 

 

 

OPTIONAL

(15.2 CM)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MOUNTING

WALL

 

 

 

 

 

 

 

 

 

 

 

BRACKET

 

 

 

 

 

 

 

 

 

 

 

 

MIN.

 

 

 

 

 

 

 

 

 

 

 

 

(15.

 

 

 

 

 

 

 

 

 

 

 

KW Units)

2 6"

 

 

 

 

 

 

 

 

 

 

(3.3–5

CM)

 

 

 

 

 

 

 

 

 

 

.4 CM)

 

 

 

 

 

 

 

 

 

 

(25

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FLOOR

(MIN

.)

 

 

 

' TO

 

 

 

6

 

 

 

 

 

(2

.13

M)

)

 

 

 

 

 

 

 

 

 

 

.44

M

 

 

 

 

8'

(2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CANADA

 

 

 

 

IN

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 2. Horizontal mounting clearances with optional bracket (CEK-M1).

MAXIMUM MOUNTING HEIGHT

(TO BOTTOM OF UNIT)

MODEL

HORIZONTAL

VERTICAL

DISCHARGE

DISCHARGE

CEH-003

9'

10'

CEH-005

9'

10'

General Safety Information

The ceiling or wall on which the heater is to be mounted must be of adequate strength to support the heater. Plaster or suspended ceilings will not sup- port this type of heater. For greater stability, we recommend the use of threaded rods.

Do not mount the heater where volatile liquids or gases will be present or where it will be exposed to rain or mist. All combustible materials should be kept at least 3 feet away from front of the heater.

In an area where the air temperature will be main- tained at less than 68˚F, the heater should be mount- ed in a postion that will not blow directly on people working in the area.

A minimum clearance for each heater (both hori- zontal and vertical mount) is listed in Figure 2. Please follow these recommendations to avoid potential problems with the function and safety of the heater.

Mounting the CEH Unit Heater

CAUTION: THE CEILING OR WALL MOUNTING STRUCTURE AND ANCHORING PROVISIONS MUST BE OF SUFFICIENT STRENGTH TO SUPPORT THE COMBINED WEIGHT OF THE HEATER AND MOUNTING BRACKETS

Horizontal Discharge

(See Figure 2 for minimum clearances)

1.Mounting with rod from ceiling or super- structure: (Figure 3)

a.Remove the four factory installed bolts from the top of the unit and screw them into the threaded holes in the back.

b.Install four 5/16-18 threaded rods in holes and secure in place using lock (jam) nuts. (Figure 3)

c.Attach the four mounting rods to the ceiling or overhead structure and anchor securely.

2.Mounting with optional bolt-on ceiling brackets: (Figure 2)

a.Bolt mounting bracket on top of unit using the four factory installed bolts.

b.Suspend the unit from ceiling or overhead structure using a 1/2 inch threaded rod or bolt, allowing a minimum 6 inches clearance from the ceiling. Using lock (jam) nut, anchor securely.

3.Mounting with optional wall hanger arm and mounting bracket: (See Parts List items #10 & #11)

a.Bolt mounting bracket on top of unit using four factory installed bolts.

b.Attach the wall hanger arm to wall using four 3/8 inch bolts or masonry fasteners.

c.Suspend the unit from hanger arm using 1/2 inch bolt. Place the rubber washer provided between the mounting brackets.

5/16-18

 

 

 

 

 

 

Threaded

 

A

C

 

 

Mounting

 

 

 

Holes

 

 

 

 

 

 

 

 

 

 

D

B

 

 

FRONT

 

 

 

 

 

 

 

 

 

 

 

MOUNTING

ROD DIMENSIONS

 

 

UNIT KW

 

ROD THREAD

A

B

C

D

3.3, 5.0

 

5/16-18

6" (15.2CM)

6.75"

4.04"

0.75"

 

 

 

 

 

 

Figure 3. Horizontal discharge rod spacing

 

2

Image 2
Contents Models CEH-003RB CEH-005P CEH-003M Features & BenefitsRead all instructions before using this heater CEH-003MB CEH-003SB CEH-005R CEH-003P CEH-005MHorizontal Delivery Installation InstructionsGeneral Safety Information Mounting the CEH Unit HeaterMaintenance Operation and MaintenanceHow to operate your heater Vertical DeliveryPhase Connections Wiring InstructionsBranch Circuit Connections Power Models with Line Voltage Control See Figures 9Manual reset limit Wiring DiagramsControl Voltage Wiring Wiring Diagrams 050327 LIMIT, CEH-003-PB, MB, R & SB, CEH-005-PB Wiring Diagrams Parts List050326 Junction BLOCK, CEH-003, CEH-005Warranty Warranty Information