Bush Hog 1947 Installing Mounting Brackets, Installing Side Frames, Installing Grease Fittings

Page 36

ASSEMBLY

ASSEMBLY

Installing Mounting Brackets

Install all mounting brackets on the tractor according to instructions packed with mounting kit.

NOTE: Leave all hardware loose until the loader is completely assembled to facilitate assembly and proper loader alignment.

Installing Side Frames

Position hinges (30) inside of side frames (13 & 14). Install 5/8 x 4-1/2 carriage bolts (35) as shown and secure with lock nuts (36).

Position side frames (13 & 14) over the loader mounting brackets and secure with hardware according to instructions packed with mounting kit.

Installing Grease Fittings

Install 1/4 x 45 grease fittings (12) into the rod end of bucket cylinders. Install 1/4 straight grease fittings (4) into the tube at bucket end of lift boom arms. Also install 1/4 straight grease fittings (4) into base and rod ends of lift and bucket cylinders.

Install Bucket

Attach bucket to lift boom frame and bucket cylinders with 1” x 4-3/8” pins (6), 3/8 x 1” shoulder bolts (9) and lock nuts (7).

1947/2047 01/11

Assembly Section 3-4

© 2011 Alamo Group Inc.

Image 36
Contents 1947 2047 To the Owner/Operator/Dealer Table of Contents Maintenance Section Safety Section Safety General Safety Instructions and Practices1947/2047 01/11 Safety Section Operator Safety Instructions and Practices Equipment Operation Safety Instructions and Practices SG-36 1947/2047 01/11 Safety Section Safety SL-33 Safety 1947/2047 01/11 Safety Section Transporting Safety Instructions and Practices Maintenance and Service Safety Instructions and Practices Safety Storage and Parking Safety Instructions and Practices Concluding Safety Instructions and PracticesDecal Location QTY Level Description Decal Description Loader Positions 1947/2047 01/11 Safety Section Loader Safety Safety Federal Laws and Regulations Introduction Section Introduction Introduction Introduction Before Operating this Machine Page Assembly and Connecting the Loader Section Assembly Assembly InstructionsProper Rear Ballasting and Wheel Spacing Installing Mounting Brackets Installing Side FramesInstalling Grease Fittings Install Bucket1947/2047 01/11 Assembly Section Installing Bucket Level Indicator Dismounting Loader and Mounting Loader to TractorDismounting Loader Mounting Loader Page Operation Section Operation Bush Hog 1947 & 2047 LoaderStandard Equipment and Specifications Operator Requirements Operation Personal Protective Equipment PPE Tractor Requirements Rops and Seat BeltTractor Lighting and SMV Emblem Tractor BallastGetting On and Off the Tractor Boarding the TractorDismounting the Tractor Starting the Tractor Pre-Operation Inspection and Service Tractor Pre-Operation Inspection/ServiceOperation Mount Assembly OPS-L-0007B Do not Operate an Unsafe Tractor or Implement Do not Operate an Unsafe Tractor or Front END Loader Operation Operating the Tractor and Loader Driving the Tractor and LoaderSG-36 Operation SL-33 Operation Operating the Loader Filling the BucketOperation Lifting the Load Carrying the Load Dumping the Bucket Lowering the BucketOperating with Float Control Loading from a Bank Operation Peeling and Scraping Loading LOW Trucks or Spreaders from a Pile Backfilling Operation Handling Large Heavy Objects Operating Bale Spear Loader Storage Shutting Down the ImplementTransporting the Tractor and Implement Operation Operation Hauling the Tractor and Implement Troubleshooting Guide Trouble Possible Cause Possible RemedyProblem Possible Cause Remedy Maintenance Section Maintenance 1947/2047 01/11 Maintenance Section Lubrication Schedule Daily Maintenance Cylinder Service Hydraulic Pressure CheckLift and Bucket Cylinder Reassembly Lift and Bucket Cylinder DissemblePrince LVR Valve Service Valve Disassembly Valve Reassembly StorageMaintenance Proper Torque for Fasteners Maintenance Maintenance Page Limited Warranty To the OWNER/OPERATOR/DEALER 1947/2047