Bush Hog 2047, 1947 manual Mounting Loader

Page 39

ASSEMBLY

5.Start tractor engine and release tractor brakes. Activate lift control lever to raise side frames up off mid mounting assembly. Continue activating the loft control lever while gradually backing the tractor up. Allow loader to roll off front mounting bracket until lift cylinders are fully extended and front bumper is resting on ground. Engage tractor brakes and shut off tractor engine.

6.Move lift and bucket control lever back and forth several times to relieve pressure on lift and bucket cylinders. Disconnect quick couplers between loader and tractor. Hang hoses over loader side frame upright for storage.

7.Fasten bolts, washers and nuts onto hinge for storage.

8.Start tractor engine, release brakes and slowly back the tractor away from the loader.

NOTE: Loader should be stored in a dry place. If loader is being stored for an extended period (one month or more), a coat of grease should be applied to the cylinder shafts to prevent rusting.

Mounting Loader

Mounting is basically reverse of dismounting.

1.Slowly drive tractor into loader until the tractor front mounting brackets touch the loader side frame channels. Engage tractor brakes and shut off tractor engine.

2.Connect quick couplers between tractor and loader by matching color coded bands. NOTE: Make sure couplers are clean.

3.Remove bolts, nuts and washers from hinge.

4.Start tractor engine and release tractor brakes. If the tractor is located on a smooth surface, rotate the bucket all the way over at this point to prevent loader from skidding forward. Continue driving loader forward while rolling the loader on the front mounting bracket tubes until side frame uprights are fully resting on midmounting brackets. Engage tractor brakes and shut off engine.

5.Refasten reusable tie straps in original locations. If rubber strap is used, hook one end of rubber strap around hoses and back onto itself. Reattach other end of rubber strap to loader side frame in area of loader front bumper.

6.Clamp hinge assembly of upright around midmounting bracket. Install bolts, washers and nuts and securely tighten.

ASSEMBLY

1947/2047 01/11

Assembly Section 3-7

© 2011 Alamo Group Inc.

Image 39
Contents 1947 2047 To the Owner/Operator/Dealer Table of Contents Maintenance Section Safety Section General Safety Instructions and Practices Safety1947/2047 01/11 Safety Section Operator Safety Instructions and Practices Equipment Operation Safety Instructions and Practices SG-36 1947/2047 01/11 Safety Section Safety SL-33 Safety 1947/2047 01/11 Safety Section Transporting Safety Instructions and Practices Maintenance and Service Safety Instructions and Practices Safety Concluding Safety Instructions and Practices Storage and Parking Safety Instructions and PracticesDecal Location QTY Level Description Decal Description Loader Positions 1947/2047 01/11 Safety Section Loader Safety Safety Federal Laws and Regulations Introduction Section Introduction Introduction Introduction Before Operating this Machine Page Assembly and Connecting the Loader Section Assembly Instructions AssemblyProper Rear Ballasting and Wheel Spacing Install Bucket Installing Mounting Brackets Installing Side Frames Installing Grease Fittings1947/2047 01/11 Assembly Section Installing Bucket Level Indicator Dismounting Loader and Mounting Loader to TractorDismounting Loader Mounting Loader Page Operation Section Bush Hog 1947 & 2047 Loader OperationStandard Equipment and Specifications Operator Requirements Operation Personal Protective Equipment PPE Rops and Seat Belt Tractor RequirementsTractor Ballast Tractor Lighting and SMV EmblemBoarding the Tractor Getting On and Off the TractorDismounting the Tractor Starting the Tractor Tractor Pre-Operation Inspection/Service Pre-Operation Inspection and ServiceOperation Mount Assembly OPS-L-0007B Do not Operate an Unsafe Tractor or Implement Do not Operate an Unsafe Tractor or Front END Loader Operation Driving the Tractor and Loader Operating the Tractor and LoaderSG-36 Operation SL-33 Operation Filling the Bucket Operating the LoaderOperation Lifting the Load Carrying the Load Lowering the Bucket Dumping the BucketOperating with Float Control Loading from a Bank Operation Peeling and Scraping Loading LOW Trucks or Spreaders from a Pile Backfilling Operation Handling Large Heavy Objects Operating Bale Spear Shutting Down the Implement Loader StorageTransporting the Tractor and Implement Operation Operation Hauling the Tractor and Implement Trouble Possible Cause Possible Remedy Troubleshooting GuideProblem Possible Cause Remedy Maintenance Section Maintenance 1947/2047 01/11 Maintenance Section Lubrication Schedule Daily Maintenance Hydraulic Pressure Check Cylinder ServiceLift and Bucket Cylinder Dissemble Lift and Bucket Cylinder ReassemblyPrince LVR Valve Service Valve Disassembly Storage Valve ReassemblyMaintenance Proper Torque for Fasteners Maintenance Maintenance Page Limited Warranty To the OWNER/OPERATOR/DEALER 1947/2047