OPERATION
OPERATION
BACKFILLING
Approach pile with a level bucket.
Poor methods actually move no more dirt and make it more difficult to hold a level grade.
Do not use bucket in dumped position for bulldozing. This method, shown above, will impose severe shock loadings on dump linkage, bucket cylinder and tractor.
1947/2047 01/11 | Operation Section |
© 2011 Alamo Group Inc.