OPERATION
OPERATION
LOADING FROM A BANK
Choose a forward gear that provides sufficient ground speed for loading.
Exercise caution when undercutting high banks. Dirt slides can be dangerous. Load from as low as possible for maximum efficiency. Loader lift and breakaway capacity diminish as loading height is increased.
Side cutting is a good technique for cutting down a big pile.
If the pile sides are too high and liable to cause
1945 01/11 | Operation Section |
© 2011 Alamo Group Inc.