Bush Hog 1945 manual OPS-L-0007B

Page 60

OPERATION

OPERATION

LOADER BOOM ASSEMBLY

Inspect condition of each arm section weldment

Ensure all pins are in place.

Ensure all bolts and screws are properly installed.

Check condition of bushings at boom pivot points.

Ensure each hydraulic cylinder is installed and retained correctly. Ensure the proper size pins are used to retain the cylinders in place and are secured properly. OPS-L-0005_B

HYDRAULIC LINE INSPECTION

Check for hydraulic leaks along hoses, cylinders and fittings. IMPORTANT: DO NOT use your hands to check for oil leaks. Use a piece of heavy paper or cardboard to check for hydraulic oil leaks.

Inspect the condition of the valve weldment.

Ensure fitting is properly connected

Inspect condition of bushings. OPS-L-0018_B

BUCKET INSPECTION

Ensure all pins are in place.

Ensure each hydraulic cylinder is installed and retained correctly. Ensure the proper size pins are used to retain the cylinders in place and are secured properly.

Inspect the condition of the bucket lug weldments.

Inspect condition of bushings.

OPS-L-0007_B

Hydraulic Hoses

Bucket Pins

1945 01/11

Operation Section 4-14

© 2011 Alamo Group Inc.

Image 60
Contents 1945 To the Owner/Operator/Dealer Table of Contents Maintenance Section Safety Section Safety General Safety Instructions and Practices1945 01/11 Safety Section Operator Safety Instructions and Practices Equipment Operation Safety Instructions and Practices SG-36 1945 01/11 Safety Section Safety Safety SL-33 Safety Safety Transporting Safety Instructions and Practices Maintenance and Service Safety Instructions and Practices 1945 01/11 Safety Section See Your Bush HOG Dealer Storage and Parking Safety Instructions and Practices Concluding Safety Instructions and PracticesDecal Location QTY Level Description Decal Description Logo Bush HOG 3.20 x Model NameD469 1945 01/11 Safety Section Safety Safety Federal Laws and Regulations Introduction Section Introduction Introduction Introduction Before Operating this Machine 1945 01/11 Introduction Section Page Introduction Assembly and Connecting the Loader Section Assembly Dismounting Loader and Mounting Loader to Tractor1945 01/11 Assembly Section Proper Ballasting and Wheel Spacing Assembly Dismounting LoaderMounting Loader Attaching Pin on Bucket Assembling Quick Attach DeviceInstalling Quick Attach Device When Connecting an Attachment to the Loader Quick Hitch Assembly Operation Section Operation Standard Equipment and Specifications Operator Requirements Operation Tractor Requirements Personal Protective Equipment PPERops and Seat Belt Tractor Lighting and SMV EmblemTractor Ballast Getting On and Off the Tractor Boarding the TractorDismounting the Tractor Starting the Tractor Pre-Operation Inspection and Service Tractor Pre-Operation Inspection/Service Loader Pre-Operation Inspection and ServiceMount Assembly OPS-L-0007B Do not Operate an Unsafe Tractor or Implement Do not Operate an Unsafe Tractor or Front END Loader Driving the Tractor and Loader Operating the Tractor and Loader SG-36 Operation Operation SL-33 Operation Operating the Loader Filling the BucketOperation Lifting the Load Operation Dumping the Bucket Operating with Float Control Loading from a Bank Operation Peeling and Scraping Loading LOW Trucks or Spreaders from a Pile Backfilling Operation Handling Large Heavy Objects Operating Bale Spear Optional Attachment Loader Storage Transporting the Tractor and ImplementShutting Down the Implement Operation Transporting on Public Roadways Operation Hauling the Tractor and Implement Troubleshooting Guide Trouble Possible Cause Possible RemedyProblem Possible Cause Remedy Maintenance Section Maintenance 1945 01/11 Maintenance Section Lubrication Schedule Adjusting Bucket Level Indicator Daily MaintenanceCylinder Service Lift and Bucket Cylinder DisassemblyLift and Bucket Cylinder Reassembly Storage Maintenance Proper Torque for Fasteners Maintenance Maintenance Page Limited Warranty To the OWNER/OPERATOR/DEALER SOM-01/11 Printed U.S.A