Exmark Ultra Vac manual Belt Routing, Inch units only 60 and 72 inch units skip to step

Page 16

FIGURE 2

7.Re-install the deck drive belt in the lower groove of the double sheave. Install the plug (Item 24) into the bore of the double sheave.

8.Remove the discharge chute from the deck. Discard the mounting hardware, but save the discharge chute for use during side discharge operation. The chute pivot pin (Item 21) and hairpin (Item 22) may be stored in the pivot holes on the discharge chute during bagging operation.

52 inch units only (60 and 72 inch units skip to step 17)

9.Remove the belt guide on the blower (see Figure3)

10.Install the belt (Item 13) included in the completing kit onto the blower assembly as shown.

11.Reinstall the belt guide removed in step 9.

FIGURE 3

BELT ROUTING

12.If the Ultra Vac is being installed on a Lazer Z with a serial number less than 260,000, it is recommended to replace the steel blocker plate mounted across the bottom of the blower with the small filler plate included in the completing kit. Refer to figure on page 26, Items 48 and 49. Use the hardware that was removed when removing the large blocker plate.

Failure to install a blocker plate will create a thrown object hazard that could injure or kill bystanders, or cause property damage. This modification should not be done if the Ultra Vac blower will be mounted on a Lazer Z with a serial number of 260,000 or higher.

13.The front right deck stiffener must be trimmed for belt clearance on 52” Lazer Z units. Measure and mark the deck stiffener per Figure 4. Trim off the indicated portion of the stiffener. Touch up the trimmed area with Exmark red touchup paint – P/N 1-850337.

16

Image 16
Contents Page Potential Hazard Exmark Parts PLUS Program Effective Date September 1 ProgramOperators Manual Table of Contents Safety Safety Alert SymbolTraining PreparationSafety Signs Specifications DimensionsModel Number Bagging SystemAssembly Instructions Lazer Z HP Assembly DiagramInstall Drive KIT Install Hood Assembly and BagsInstall Blower Assembly Assemble TubesBelt Routing Assembly Instructions Lazer Z & Lazer Z XP Lazer Z Assembly Diagram Lazer Z XP Assembly Diagram Install the Hood Assembly and Bags Lazer Z units only Lazer Z XP units skip to stepLazer Z XP units only Lazer Z units continue at step Belt Routing Inch units only 60 and 72 inch units skip to step72 inch units only 52 inch units continue at step Install the Weight Plates Assemble the TubesInstall the Removable Weights RUN in 52 Units only OperationPRE-START Mowing Bagger Removal for Side DischargeTransporting Maintenance Periodic MaintenanceBelts. Service Interval 50 Hours Parts Lists DecalsBlower Assembly Lazer Z HP 44, 48, 52 & Lazer Z Blower Assembly Lazer Z HP 44, 48, 52 & Lazer Z 52 Hood and BAG Assembly Lazer Z HP 44, 48, 52, & Lazer Z Hood and BAG Assembly Lazer Z HP 44, 48, 52, & Lazer Z 52 Blower Assembly Lazer Z 60 & 72 and Lazer Z XP 60 Blower Assembly Lazer Z 60 & 72 and Lazer Z XP 60 & 72 Hood and BAG Assembly Lazer Z 60 & 72 and Lazer Z XP 60 Hood and BAG Assembly Lazer Z 60 & 72 and Lazer Z XP 60 & 72 Completing KIT Assembly Lazer Z 52, 60, & 72 Lazer Z XP 60 Lazer Lazer XP Drive KIT Assembly Lazer Z HP 44,48 Warranty Limited Warranty Exmark Commercial Turf EquipmentPage Service Record See EXMARK’S Complete Line of Products for Turf Care