![](/images/new-backgrounds/1188685/1886857x1.webp)
4SWITCH INSTALLATION
Confirming Installation Preparation | 51 |
| ||
Installation Flow | 51 |
|
|
|
Mounting the Switch in | ||||
Connecting PGND Wire and Power Cord | 57 | |||
Installing Cabling Rack | 62 |
|
| |
Installing Fan Tray | 62 |
|
|
|
Installing PoE Lightning Protection Box | 63 | |||
Installing I/O modules | 64 |
|
| |
Connecting Interface Cables 65 |
|
| ||
Cable Routing Recommendations | 68 |
| ||
Cable Management 68 |
|
| ||
Verifying the Installation | 71 |
|
|
5SYSTEM DEBUGGING
Setting up Configuration Environment 73
Powering and Booting the Switch 74
6SWITCH MONITORING AND MAINTENANCE
Monitoring the Switch | 77 |
Hardware Maintenance | 79 |
Software Upgrade 84 |
|
Password Loss 93 |
|
ALIGHTNING PROTECTION OF THE SWITCH
Installation of Lightning Arrester for AC Power (Socket Strip with Lightning Protection) 95
Installation of Lightning Arrester for Network Port 96