
3M™ Digital Media System 800 Series | Installation and System Setup |
5. Determine the appropriate anchor to use with | Masonry |
your wall type. Install five anchors at the |
|
marked locations. Install, but do not tighten, five |
|
mounting screws. | Hollow Wall |
Solid Wall/ Wall Stud
ENGLISH
6.(Digital Media System 810 Only) Measure the thickness of the whiteboard/projection screen to determine the number of shims needed.
Screen Thickness | Number of Shims |
|
|
0 | |
|
|
1 | |
|
|
2 | |
|
|
3 (maximum) | |
|
|
Hang mounting shim(s) on the screws.
7.Hang the metal mounting plate on the screws and tighten securely.
8.Hang the projector by aligning and hooking the unit on the metal mounting plate.
Note: Ensure locking pin is engaged. You should hear a click once the unit is securely on mounting plate.
Mounting(5)
Screws
Wall
Shim Only) (810
Whiteboard/Screen
Projection
Screen Thickness
Plate
Mounting
9.Using 2 people, slightly push up on the unit to make sure unit is locked on mounting plate
© 3M 2007. All Rights Reserved. | 13 |