Smoking by individuals exposed to asbestos fibers greatly increases the risk of serious bodily harm.
Unless positively certain that the existing
See current edition of the Resilient Floor Covering Institute (RFCI) publication Recommended Work Practices for Removal of Resilient Floor Coverings for instructions on removing all resilient floor covering structures or contact your retailer or Armstrong World Industries, Inc. 1 800 233 3823
The floor covering or adhesive in this package does NOT contain asbestos.
Room Preparation
Remove baseboard,
Procedure
StrataMax flooring is designed for modified loose lay installation using acrylic
not use the tape around the entire perimeter of the room.
StrataMax flooring should be cut approximately 1/8" to 3/16" away from all vertical surfaces such as walls, cabinets, pipes, etc. This will prevent any fullness around the perimeter of the room and also provide a small gap that must be filled with a good quality siliconized or acrylic caulk, even in areas where trim moldings or vinyl wall base will be put on top. This will prevent moisture from getting beneath the new flooring. StrataMax flooring should not be cut full or snug. Make sure all areas are lying flat before applying caulk in the perimeter gap.
Seams
If a seam is required in a primary part of the room, it should be made after the product has been rough cut
and is lying flat in proper position in the room but prior to final cutting and fitting around the perimeter. Overlap the selvage edges of both pieces of flooring so that the proper pattern match is achieved. Then, carefully fold back the seam edges without shifting the sheets, so that a strip of scrap material can be placed under the product where the seam will be cut. This will save your knife blade and prevent scoring the subfloor or old flooring directly beneath the seam. Reposition the two edges, ensuring a good pattern match.
[Seams should be