
Screw List
Step | Screw | Quantity | Screw Type |
|
|
|
|
Button Board | 2 |
| |
Assembly |
|
|
|
|
|
|
|
4.Connect the touch pad FCC to the button board.
5.Bring the button board FCC through the upper cover.
116 | Chapter 3 |
Step | Screw | Quantity | Screw Type |
|
|
|
|
Button Board | 2 |
| |
Assembly |
|
|
|
|
|
|
|
4.Connect the touch pad FCC to the button board.
5.Bring the button board FCC through the upper cover.
116 | Chapter 3 |