IMPORTANT: Dryer must be installed in a location/environment in which the ambient temperature remains between 40° F (4.44° C) and 130° F (54.44° C).

B. UNPACKING AND SETTING UP

Remove protective shipping material (i.e., plastic wrap and optional shipping box) from dryer.

IMPORTANT: Dryer must be transported and handled in an upright position at ALL times.

The dryer can be moved to its final location while still attached to the skid or with the skid removed. To unskid the dryer, locate and remove the four (4) lag bolts securing the base of the dryer to the wooden skid. One (1) is located at the rear base (remove the back panel for access), and two (2) are located in the bottom of the lint chamber. To remove the two (2) lag bolts located in the lint chamber area, remove the lint drawer and the two (2) Phillips head screws securing the lint door in place.

1.Leveling Dryer

To level dryer, place 4-inch (10.16 cm) square metal shims (refer to the illustration above) or other suitable material under the base pads. It is suggested that the dryer be tilted slightly to the rear.

113202 - 10

www.amdry.com

9

Page 13
Image 13
ADC AD-115ES installation manual Unpacking and Setting UP