Chapter 3. Operation

TX PRM

Controls the sending of performance report messaging (PRM) data on the facility data link (FDL). The PRM data continues to be col- lected even if XMIT PRM is turned off (possible only with ESF for- mat). Choose either ON or OFF.

LBO

Write security: 2; Read security: 5

Selects the Line Build Out (LBO) for the network interface. The LBO setting determines the amplitude of the transmitted signal. For short haul (intra-building) applications, choose from the ft options. For long haul (out of plant) applications, choose from the dB options. When you select this item, a list of choices displays. Select the appropriate option.

TEST

Write security: 3; Read security: 5

These options initiate different types of tests and display test results.

PRT

Displays the port number.

LOC LB

Write security: 4; Read security: 5

Causes loopback on near-end (local) port (see Figure 3-3). The fol- lowing options are available:

LINE

Metallic loopback

PAYLD

Payload loopback - framing and

 

clocking are regenerated

T1 Port

NI CSU

DS1

Payload Loopback

Line Loopback

 

Figure 3-3. T1 Loopback Test Diagram

IMUX MENUS

Read Security: 5

 

Contains the inverse muxing configuration parameters for the NxT1 HSSI

 

Option Module.

61200771L1-1

NxT1 HSSI/V.35 Module User Manual

35

Page 35
Image 35
ADTRAN NxT1 HSSI/V.35 user manual Write security 4 Read security, Option Module