Installation

Unpacking

All transit bolts and packing must be removed before using the appli- ance.

Using the supplied

 

 

 

spanner,

unscrew

 

 

 

and remove the 2

 

 

 

rear bottom screws.

 

 

 

Slide

out

the

2

 

 

 

plastic pins. Lay the

 

 

 

machine

on

its

 

 

 

back,

taking care

P1129

 

P0001

 

 

 

not to squash the hoses. This can be avoided by

 

placing one of the corner

packing pieces

1

between the machine and the floor.

 

Remove the polystyrene block from the

2

 

bottom of the machine and release the two

3

plastic bags.

 

 

 

 

 

 

 

Carefully slide out the left-hand bag removing

 

it towards the right and then downwards.

P1124

Slide out the right-

2

 

 

hand bag removing

 

 

 

it towards the left

 

 

 

and then upwards.

 

 

 

The bottom cover

 

 

A

plate, which can

 

1

 

 

be found inside

 

 

 

 

the machine with

P1204

 

P1205

the instruction

 

 

 

 

book, will now need to be fitted. Hook the bottom of the plate «A», into position first. Then push the other end of the plate into position.

Important!

You can find more detailed instructions regarding the bottom cover assemblig in its relative bag.

46

Page 46
Image 46
AEG 14820 manual Installation, Unpacking