
ENGLISH
ASSEMBLY INSTRUCTIONS
TOOLS REQUIRED FOR ASSEMBLY
(2)7/16" wrenches
(2)1/2" wrenches
(2)9/16" wrenches
(2)3/4" wrenches or adjustable wrenches
3.Assemble four aerator knives on the outside of each single spool assembly. Rotate each knife to insert the locking tab into the spool plate, then align the square holes and secure with a 5/16" x 3/4" carriage bolt, 5/16" lock washer and 5/16" nylock nut. See figure 2.
4.Push split plastic bearings into each end of the spool tube. See figure 2.
Before assembling the aerator, lay out all the parts and hardware as shown on previous pages.
5/16" x 3/4"
CARRIAGE BOLT (F)
5/16" LOCK WASHER (N)
CAUTION: POINTS OF AERATOR
KNIVES ARE SHARP! EXERCISE
CAUTION AT ALL TIMES WHILE
ASSEMBLING AND USING THE
AERATOR.
1.Assemble eight aerator knives on the outside of each double spool assembly. Rotate each knife to insert the locking tab into the spool plate, then align the square holes and secure with a 5/16" x 3/4" carriage bolt, 5/16" lock washer and 5/16" nylock nut. See figure 1.
2.Push split plastic bearings into both ends of each double spool tube. See figure 1.
5/16" x 3/4" CARRIAGE
BOLT (F) 5/16" LOCK WASHER (N)
SPLIT | 5/16" NYLOCK | |
BEARING (W) | ||
NUT (K) | ||
|
SPLIT
BEARING (W)
FIGURE 1
SPLIT | 5/16" NYLOCK |
BEARING (W) | |
| NUT (K) |
SPLIT
BEARING (W)
FIGURE 2
5.Assemble a wheel bracket to the middle hole in the shaft so that the bracket hub faces the short end of the shaft. Fasten the bracket to the shaft using a 1/4" x
6.
SHORT
END 3/8" x
1/4" NYLOCK NUT (L)
3/8" NYLOCK NUT (J)
1/4" x
FIGURE 3