Air King VAL30AB Section, Supply from home, Hot Black, or Bare, Neutral White, Ground Green, Wire

Models: VAL30AB VAL30 VAL36 VAL36AB

1 12
Download 12 pages 40.57 Kb
Page 3
Image 3
Supply from home

Supply from home

Hot (Black)

Neutral (White)

 

Ground (Green or Bare)

 

Hot (Black)

or Bare)

 

 

Neutral (White)

Ground (Green
Wire

 

Compartment

 

 

 

From Hood

 

Figure 4

 

 

B

B

A

A

Figure 6

 

NOTE: If the top chimney section (included) will be installed, slide the top section inside of the bottom section at this point.

3.Slide chimney in place so top tabs of the chimney are secured in place on the indents of the vertical chimney bracket and the backside of the chimney fits between the hood and the wall with the bottom tabs overlapping the back lip of the hood (Figure 7).

SECTION 5

Attaching the Chimney

1.Mark the location for the vertical chimney bracket: If using the upper chimney section: 9-3/4"

If not using upper chimney section: 15-3/4"

2.If installing onto drywall, drill holes into wall using a 3/16" drill bit. Install wall anchors

into the drilled holes (one for each hole). Secure bracket into place with (2) provided #6 x 1" screws. If installing into other material (brick, cement, plaster, etc.) choose an appropriate fastner capable of supporting the weight of the chimney (Figure 5).

Figure 7

Details of duct collar, ducting, and electrical have been omitted from drawing for clarity purposes.

Side View

Vertical Chimney

Bracket

9-3/4"

or

15-3/4"

4.To install the upper section, mark the location of the included horizontal mounting bracket using the bracket as a template. Make sure the bracket is level and in line with the bottom section. The height will be dependent on your installation require- ments. Make sure the slots in the side of the chimney will match the holes in the mounting bracket. If installing onto drywall, drill holes into wall using a 3/16" drill bit. Install wall anchors into the drilled holes (one for each hole). Secure bracket into

place with (2) provided #6 x 1" screws. If installing into other material (brick, cement, plaster, etc.) choose an appropriate fastner capable of supporting the weight of the chimney (Figure 8).

Mounting
Bracket

Figure 5

Details of duct collar, ducting, and electrical have

been omitted from drawing for clarity purposes.

3.Press in appropriate tabs on lower chimney section (section with vent holes). If using the upper chimney, press in tabs in middle of the chimney (Position A), other- wise press in tabs at top of the chimney (Position B). Press in tabs at the bottom of the chimney so there is approximately 1/4" of clearance (Figure 6).

Figure 8

6728025 Rev. E 7-10

www.airkinglimited.com

3 of 12

Page 3
Image 3
Air King VAL30AB Section, Supply from home, Hot Black, or Bare, Neutral White, Vertical Chimney Bracket 9-3/4 or 15-3/4