Alamo 1595 manual Assembly, Plumbing Hydraulic Valve

Models: 1595

1 102
Download 102 pages 57.32 Kb
Page 41
Image 41
Plumbing Hydraulic Valve

ASSEMBLY

5.On level ground, tilt the attachment down 90 degrees and lower it to the ground. Lower the loader further to slightly raise the front of the tractor of the tractor off the ground. Drive the tractor in reverse while the attachment is on the ground for 20-30 feet to insure the attachment does not disconnect. If the attach- ment disconnects during this process, discontinue the use of attachment and contact your dealer.

Do not use an attachment that is not securely attachment that is not securely attached to the quick hitch. The attachment could fall resulting in severe crushing injuries or death to the operator or bystanders.

Plumbing Hydraulic Valve

1.Install O-Ring 90º elbow fittings in port on each

side of valve pointing away from handle. Install O-Ring 90º elbow fitting in front tank port point- ing away from handle. Tighten jam nuts.

2.Install straight O-Ring to pipe adapters on front ports of valve. Install male quick couplers on male adapters on valve. Attach color coded identification dust covers on quick couplers. Boom lift is on right and bucket functions are on left. Figure AsmP-L-0001

ASSEMBLY

1595 01/11

Assembly Section 3-9

© 2011 Alamo Group Inc.

Page 41
Image 41
Alamo 1595 manual Assembly, Plumbing Hydraulic Valve