OPERATION

OPERATION

Side cutting is a good technique for cutting down a big pile.

If the pile sides are too high and liable to cause cave-in, use loader to break down the sides until a slot can be cut over the top.

Another method for large dirt piles is to build a ramp approach to the pile.

1595 01/11

Operation Section 4-30

© 2011 Alamo Group Inc.

Page 74
Image 74
Alamo 1595 manual Operation