Alamo 1595 manual Assembly, Plumbing Loader to Control Valve

Models: 1595

1 102
Download 102 pages 57.32 Kb
Page 43
Image 43
Plumbing Loader to Control Valve

ASSEMBLY

Plumbing Loader to Control Valve

1.Install Hoses onto boom oil tubes. Install and tighten one at a time from the bottom up. Loosening the closest oil line clamp will ease installation.

2.Install large identification dust plugs onto free ends of hoses. Slide hose sleeve over hoses. Install female quick couplers onto free ends of hoses.

Hose Color identification

Yellow - Lift Cylinder Rod

Green - Lift Cylinder Base End

Red - Bucket Cylinder Rod

Blue - Bucket Cylinder Base Rod

3.Connect hoses from upper two boom oil lines to right male couplers on valve. Connect lower two boom oil lines to left male quick couplers on valve.

4.Attach free end of rubber strap to loader right side frame.

5.After all plumbing has been completed, slowly cycle lift and bucket cylinders several times to purge air from hydraulic system. Retract cylinders and shut off tractor engine, engage parking brake, and remove key. Replenish tractor hydraulic system with recommended hydraulic fluid. (Figure AsmP-L- 0003)

Manual backgroundManual backgroundManual backgroundASSEMBLY

Escaping hydraulic fluid under pressure can have sufficient force to penetrate skin causing serious personal injury. If injured by escaping hydraulic fluid, obtain medical treatment immediately.

1595 01/11

Assembly Section 3-11

© 2011 Alamo Group Inc.

Page 43
Image 43
Alamo 1595 manual Assembly, Plumbing Loader to Control Valve