Installation

35 – 50 LB Models

85 LB Models

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AC

Drive XFMR

4-Conductor Cable

2-Conductor Cable

Main Drive Motor Cable

(Factory Installed)

Sewer

Main

Drain Valve

Drive Motor

AC

Drive XFMR

Main Drive Motor Cable

(Factory Installed)

2-Conductor Cable

And 4-Conductor Cable

Sewer

Main

Drain Valve

Drive Motor

 

Filter

Route Cable Under Frame Then

Filter

Pump Motor

Tank

Tank

Around To Top Of Frame.

 

 

Junction Box

 

Follow Main Drive Motor Cable

 

 

 

Route to AC Drive Module

 

 

 

Tank

Tank

 

 

Drain Valve

 

 

Drain Valve

 

 

 

 

 

Pump Motor

 

Wet Clean Module Cable Routing

Junction Box

 

 

R009I

 

 

 

Figure 25

c.Route 4-conductor and 2-conductor cables along the frame of the washer- extractor, following the same routing as the main drive motor cable. Allow sufficient clearance between the cables and any moving parts of the washer- extractor. See Figure 25.

Note: Route cables underneath the frame as shown in Figure 25.

39

F232058