4 | SwitchBlade Chassis and Fan Tray |
■Blank faceplates for all but one switch controller bay and one line card bay
■One blank faceplate for each PSU bay
■Two
■One 19 inch
■Two
■Two Ethernet patch cables for connecting switch controller
■One SwitchBlade Documentation and Tools
■One SwitchBlade Chassis and Fan Tray Quick Install Guide.
■One Safety and Statutory Information booklet.
■One warranty card.
■One cable manager with four wire loops (with the SwitchBlade 8 only).
■One rack crossbar (to support the chassis’s weight during installation).
Related items that can be purchased separately:
■Blank faceplates for switch controller and line card bays
■Blank faceplates for PSU bays
■Fan trays
■Blank faceplates for fan tray bays
Selecting A Site
The chassis can be installed in a standard
■allows adequate airflow around the chassis and its vents.
■is free of dust and moisture.
■will allow the chassis and its components to operate within a temperature range of 0 to 40º C (32 to 104º F) and a humidity range of 5 to 95% non- condensing.
■has a reliable and earthed (grounded), preferably dedicated and filtered power supply circuit.
■does not expose cabling to sources of electrical noise, such as radios, transmitters, broadband amplifiers, power lines, electric motors, and fluorescent fixtures.
■allows easy access to the chassis’s power and cable connections.
■will allow all related network devices to be connected to the chassis without exceeding maximum cable length limitations. See the SwitchBlade Hardware Reference for cable length specifications.