![Installing the Switch on a Wall](/images/new-backgrounds/124801/12480161x1.webp)
The
7.Power ON the end nodes connected to the ports on the switch.
8.Check the LNK/ACTY LED for each port. The LED should be steady green or blinking. If a LNK/ACTY LED remains OFF, refer to “Verifying and Troubleshooting the Installation” on page 22 for assistance.
Installing the Switch on a Wall
The switch can be mounted either vertically or horizontally on a wall using the keyholes on the bottom of the chassis.
Note
For
To install the switch on the wall, perform the following procedure:
1.Remove the rubber feet, all cables, and the DC power cord from the switch.
2.Select a wall location for the device.
3.Install two plastic anchors and two
4.Position the device onto the wall screws. If you are mounting the switch horizontally, position the switch so that the ports are facing down and the LEDs are facing up. If you are mounting the switch vertically, position the switch so that the ports are facing to the left and the LEDs to the right.
5.Power ON the switch using the external power adapter supplied with the unit. Connect the external power adapter to an appropriate power source and the DC cable on the adapter to the DC connector on the switch.
The PWR LED on the switch’s front panel should be ON. If the LED remains OFF, refer to “Verifying and Troubleshooting the Installation” on page 22 for assistance.
Warning
The power cord is used as a disconnection device. To
equipment, disconnect the power cord. | 9 |
21 |