Installation Checklist

Installation Checklist

This checklist is for personal records only.

Consumer Installer

Doors

Doors are aligned with each other. (After food has been added to refrigerator , consumer should check door alignment).

Doors seal completely to refrigerator cabinet.

Handles are solidly attached to doors.

Ice ’N WaterDispenser Models

If doors were removed to install refrigerator, top hinge wire connectors are reconnected.

Leveling

Refrigerator is stable.

Toe grille is properly attached to refrigerator.

Ice Maker

Water supply to refrigerator is turned on.

Water leaks are not present at connection between household water supply and refrigerator. (After 24 hours, consumer should check connection for water leaks.)

Ice maker arm is in on position for ice production. (It may take up to 24 hours for first harvest of ice.)

Product Literature

Owner's manual is reviewed including the following information.

Product registration card

Water filter installation and replacement (see water filtration package)

Refrigerator and freezer controls

Chiller Freshsystem

Garden Freshcrispers

Normal operating sounds

Water Filter (Some models)

Bypass cartridge is removed and water filter is installed

Water leaks are not present around filter head

Filter indicator light function is explained (some models)

Notes

Consumer's Signature

Installer's Signature

Installer's Company Name/Phone Number

Date

6

Page 6
Image 6
Amana ARS9168AS, Refrigerator Installation Checklist, Consumer Installer Doors, Leveling, Ice Maker, Product Literature