
Chapter 3. Installing a Battery Backup Unit
3Press down gently until the BBU is seated.
Figure 12. BBU control module connected to the controller
4Turn the controller over, insert the plastic screw head that you removed in step 1 into the plastic post, and tighten it gently but firmly. (Do not
5If necessary, attach the extension cable to the BBU control module in order to reach the intended location of the remote battery board.
6Install your 3ware RAID controller. Refer to “Chapter 2. Installing Your 3ware RAID Controller” on page 10 for details.
Installing the Remote Battery
1Remove the metal filler brackets for the expansion slot in which you have decided to install the remote battery board.
Save the screws; they will be used to secure the remote battery board after you have installed it in the slot.
2If your enclosure is
3Select the battery location on the remote battery board.
The battery can be mounted in 3 different positions, as marked on the board (see Figure 13). Use the position that will make it
193ware 9690SA SAS/SATA RAID Controller Installation Guide