![](/images/new-backgrounds/1135333/13533373x1.webp)
13)Hoist the new steam coil into place and bolt down.
14)Replace ALL of the panels removed in Step #10.
15)Reinstall ALL of the piping removed from the old steam coil in Step #9.
NOTE: Thread sealant certified for steam piping must be applied to the threads.
16)Reconnect ALL of the piping (supply lines and return lines) disconnected in Step #8.
17)Reinstall steam damper cylinder (piston) removed in Step #6.
18)Reestablish electrical service to the dryer.
19)Close the 1/2" plug which was opened in Step #5.
WARNING: THE 1/2" PLUG MUST BE CLOSED BEFORE ATTEMPTING TO APPLY ANY STEAM PRESSURE.
20) Open the return line then open the supply line.
33