Connect L1 and L2 to the power block and ground to the copper lug located in the rear service box mentioned above.

SINGLE-PHASE (1ø) ELECTRICAL CONNECTION LEADS

BLACK

+

POSITIVE

WHITE

+

NEUTRAL

GREEN

+

GROUND

OR

L2

If local codes permit, power to the dryer can be made by the use of a flexible U.L. listed power cord/ pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker panel. In both cases, a strain relief must be installed where the wiring enters the dryer.

b.3-Phase (3ø) Wiring Connections (Hookup) - for NON-REVERSING MODELS ONLY

The electrical connections on ALL 3-phase (3ø) gas model and steam model dryers are made into the rear service box located at the upper left area of the dryer. Electrical connections for electrically heated dryers are made in the electric oven area located at the upper rear area of the dryer.

NOTE: A CIRCUIT SERVING EACH DRYER MUST BE PROVIDED.

If local codes permit, power to a gas or steam dryer can be made by the use of a flexible U.L. listed power cord/pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker panel. In ALL cases, a strain relief must be installed where the wiring enters the dryer.

22

Page 26
Image 26
American Dryer Corp ML-78 installation manual Black Positive White Neutral Green Ground