K. PREOPERATIONAL TEST
ALL dryers are thoroughly tested and inspected before leaving the factory. However, a preoperational test should be performed before the dryer is publicly used. It is possible that adjustments have changed in transit or due to marginal location (installation) conditions.
1.Turn on electric power to the dryer.
Open ALL shutoff valves (gas models only).
2.Refer to the Operating Instructions for starting your particular model dryer.
3.Gas Dryers
a.When a gas dryer is first started (during initial
NOTE: During the purging period, check to be sure that ALL gas shutoff valves are open.
NOTE: Gas dryers are equipped with a Direct Spark Ignition (DSI) system, which has internal diagnostics. If ignition is not established within three (3) times, the heat circuit in the DSI module will lock out until it is manually reset. To reset the DSI system, open and close the main door and restart the dryer.
b.A gas pressure test should be taken at the gas valve pressure tap of each dryer to assure that the water column (W.C.) pressure is correct and consistent.
NOTE: Water column pressure requirements (measured at the pressure tap of the gas valve body):
Natural Gas | 3.5 Inches (8.7 mb) Water Column. |
Liquid Propane (L.P.) Gas | 10.5 Inches (26.1 mb) Water Column. |
IMPORTANT: There is no regulator provided in an L.P. dryer. The water column pressure must be regulated at the source (L.P. tank), or an external regulator must be added to each dryer.
4.Steam Dryers
Check to ensure that steam damper is functioning properly.
The steam damper should not “slam” (open or closed) when it reaches the end of (piston) travel. Additionally, the steam damper should not bind and/or stop during travel. If either of these conditions occur, the flow control must be adjusted. Refer to the illustration on page 25 for air adjustment instructions.
5.Make a complete operational check of ALL safety related circuits:
a.Door switch(es)
b.
c.Sail switch (for gas models only)
113344 - 9 | www.amdry.com | 29 |